EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Study on Vibration Superposition Induced by Dual‐Line Subway Train Operation in Submerged Tunneling Sections

Yunsi Liu, Yueyuan Huang, Yuxiao Wu

Advances in Civil Engineering · 2026-01 · 2026 (1)

DOI: 10.1155/adce/1475887 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Advances in Civil Engineering, online erschienen am 27.06.2026. Verfasst von Yunsi Liu und 2 weiteren Autor:innen. Die Arbeit nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Accurately predicting the vibration response when a new tunnel passes beneath an existing double‐track railway represents a major challenge in assessing the environmental impact of urban underground engineering. Traditional numerical simulations rely heavily on noisy field‐measured signals and simplified single‐source assumptions, leading to significant errors in complex multisource scenarios. To achieve refined vibration response simulation, this paper proposes a FLAC3D simulation method integrating Variational Mode Decomposition (VMD) signal denoising with multisource vibration superposition theory. The VMD algorithm (with optimized parameters K = 8, α = 2500) is applied to denoise field‐measured vibration signals, achieving a correlation coefficient of 0.9861 between the denoised and original signals—a 23.7% improvement over conventional denoising methods. Subsequently, based on vibration superposition theory, a multisource input model accounting for propagation path attenuation is constructed. Finally, high‐precision dynamic calculations are performed within FLAC3D. The reliability of the proposed method is validated by comparing results with field measurements, showing a reduction in peak acceleration prediction error from 18.6% (using un‐denoised signals) to 6.8% (using the proposed method). The study analyzes the combined effects of source magnitude, source location, and propagation attenuation. Results indicate that the superposition generated by double‐track operation is not a simple numerical summation; the measured superposition value at the center point C2 is 1.54 times the average of the two individual responses, indicating constructive interference. The strongest vibration superposition effect occurs at C2, with a limited influence range—only the tunnel crown experiences significant vibration superposition (superposition rate of 54.6% at roof monitoring point P1, decreasing to less than 10% at the invert). This research provides new computational tools and methods for vibration studies in underground transportation networks.

Förderung

  • National Natural Science Foundation of China

Zitieren

APA

Liu, Y., Huang, Y., & Wu, Y. (2026). Study on Vibration Superposition Induced by Dual‐Line Subway Train Operation in Submerged Tunneling Sections. Advances in Civil Engineering, 2026(1). https://doi.org/10.1155/adce/1475887

Vancouver

Liu Y, Huang Y, Wu Y. Study on Vibration Superposition Induced by Dual‐Line Subway Train Operation in Submerged Tunneling Sections. Advances in Civil Engineering. 2026;2026(1). doi:10.1155/adce/1475887

BibTeX
@article{Liu2026,
  author = {Liu, Yunsi and Huang, Yueyuan and Wu, Yuxiao},
  title = {Study on Vibration Superposition Induced by Dual‐Line Subway Train Operation in Submerged Tunneling Sections},
  journal = {Advances in Civil Engineering},
  year = {2026},
  volume = {2026},
  number = {1},
  doi = {10.1155/adce/1475887}
}
Kostenlos starten →