Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm

Vu Hong Son Pham, Thuy Dung Dau, Le Gia Phuc Huynh

Applied Computational Intelligence and Soft Computing · 2026-01 · 2026 (1)

DOI: 10.1155/acis/9939592 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Computational Intelligence and Soft Computing, online erschienen am 19.04.2026. Verfasst von Vu Hong Son Pham und 2 weiteren Autor:innen. Die Arbeit nennt 20 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper addresses shift scheduling to optimize time and cost while considering the impact of night shifts. It involves determining work shift options, sequencing project tasks, and taking labor constraints into account to provide options that optimize time‐cost trade‐off (TCTO), and the number of night shift hours, or can be called as the time‐cost–utilization work shift trade‐off (TCUT) problem. The approach involves the use of a hybrid sand cat arithmetic optimization algorithm (AOA) (SC‐AOA), which integrates sand cat swarm optimization (SCSO) and AOA. This method balances exploration and exploitation phases effectively, improving convergence accuracy and avoiding local optima. The SC‐AOA model is validated through case studies, demonstrating superior performance in optimizing TCUT compared to previous algorithms. Results from experiments on two specific case studies indicated that the SC‐AOA efficiently utilized factors during the search and exploitation processes, while also flexibly adjusting to achieve optimal results. This confirms that SC‐AOA is a powerful and efficient tool in construction project management. The paper’s approach addresses the critical TCUT problem in construction management, providing a more efficient and flexible scheduling solution. Its validation through real‐world case studies highlights its practical applicability and potential to significantly improve construction project outcomes.

Zitieren

APA

Pham, V. H. S., Dau, T. D., & Huynh, L. G. P. (2026). Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm. Applied Computational Intelligence and Soft Computing, 2026(1). https://doi.org/10.1155/acis/9939592

Vancouver

Pham VHS, Dau TD, Huynh LGP. Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm. Applied Computational Intelligence and Soft Computing. 2026;2026(1). doi:10.1155/acis/9939592

BibTeX
@article{Pham2026,
  author = {Pham, Vu Hong Son and Dau, Thuy Dung and Huynh, Le Gia Phuc},
  title = {Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm},
  journal = {Applied Computational Intelligence and Soft Computing},
  year = {2026},
  volume = {2026},
  number = {1},
  doi = {10.1155/acis/9939592}
}
Kostenlos starten →