EUVIMEDEUVIMED entdecken
Crossref

Dynamic Scheduling Optimization of Multi-Robot Collaborative Assembly Systems Combining GraphSAGE and Digital Twins

Yunzhen Zhang, Lili Han, Cunying Zhang, Yu Liu

Journal of Advanced Manufacturing Systems · 13.11.2026 · 1-33

DOI: 10.1142/s0219686728500473 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Advanced Manufacturing Systems, online erschienen am 13.11.2026. Verfasst von Yunzhen Zhang und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Scheduling lag, path conflicts, and resource overload are the common problems that a multi-robot collaborative assembly system faces under task dynamics changes, strong resource coupling, and unexpected interruptions; scheduling mechanisms struggle to capture dynamic relations among entities and to verify strategy feasibility promptly. To tackle the problem, this paper proposes a dynamic scheduling optimization framework based on Graph Sample aggreGatE (GraphSAGE) and digital twins. Through inductive learning, the framework embeds the dynamic relations of heterogeneous entities online and handles the real-time representation and scheduling of unseen nodes. A high-fidelity closed-loop simulation environment based on a digital twin verifies the feasibility and pre-evaluates the performance of each strategy before deployment, which prevents invalid or harmful scheduling instructions from reaching the physical system. Experiments evaluate the proposed approach under different task loads, robot counts, and fault disturbance scenarios against five scheduling methods. The results indicate that for high task frequency, the average task response time is 2.6 s; the average task success rate is 95.0%; the number of path conflicts is less than 3; the rate of resource contention is less than 10%; and the average rescheduling time under a 25% sudden failure rate is 0.85 s. Ablation experiments validate the graph embedding mechanism and the twin verification module separately. This study offers a secure and robust scheduling technique for multi-robot cooperation in high-speed dynamic intelligent manufacturing environments.

Zitieren

APA

Zhang, Y., Han, L., Zhang, C., & Liu, Y. (2026). Dynamic Scheduling Optimization of Multi-Robot Collaborative Assembly Systems Combining GraphSAGE and Digital Twins. Journal of Advanced Manufacturing Systems, 1-33. https://doi.org/10.1142/s0219686728500473

Vancouver

Zhang Y, Han L, Zhang C, Liu Y. Dynamic Scheduling Optimization of Multi-Robot Collaborative Assembly Systems Combining GraphSAGE and Digital Twins. Journal of Advanced Manufacturing Systems. 2026:1-33. doi:10.1142/s0219686728500473

BibTeX
@article{Zhang2026,
  author = {Zhang, Yunzhen and Han, Lili and Zhang, Cunying and Liu, Yu},
  title = {Dynamic Scheduling Optimization of Multi-Robot Collaborative Assembly Systems Combining GraphSAGE and Digital Twins},
  journal = {Journal of Advanced Manufacturing Systems},
  year = {2026},
  pages = {1--33},
  doi = {10.1142/s0219686728500473}
}
Kostenlos starten →