Editorial
Why has Palantir been given an interim contract to work on an NHS patient data project?
BMJ · 28.06.2023 · p1482
DOI: 10.1136/bmj.p1482 ↗Kurz gefasst
Editorial in der Zeitschrift BMJ, online erschienen am 28.06.2023. Verfasst von David Wrigley. Beteiligte Einrichtung: BMA GP Committee (England). Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 4 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Autor:innen und Institutionen
- BMA GP Committee (England).
Zitieren
APA
Wrigley, D. (2023). Why has Palantir been given an interim contract to work on an NHS patient data project?. BMJ, p1482. https://doi.org/10.1136/bmj.p1482
Vancouver
Wrigley D. Why has Palantir been given an interim contract to work on an NHS patient data project?. BMJ. 2023:p1482. doi:10.1136/bmj.p1482
BibTeX
@article{Wrigley2023,
author = {Wrigley, David},
title = {Why has Palantir been given an interim contract to work on an NHS patient data project?},
journal = {BMJ},
year = {2023},
pages = {p1482},
doi = {10.1136/bmj.p1482}
}
EUVIMED