Proving Wind Power in New England
Mechanical Engineering · 1998
DOI: 10.1115/1.1998-aug-9 ↗Kurz gefasst
Fachartikel in der Zeitschrift Mechanical Engineering, 1998. Verfasst von Michael Valenti. Die Arbeit wurde bisher 1-mal zitiert (Crossref).
Abstract (Originalsprache)
This article discusses that despite of the challenging winter weather conditions the largest windmill-based power plant located on East of Mississippi has been exceeding performance expectations. Green Mountain Power selected the Searsburg site because of its powerful and persistent winds and its proximity to existing access roads and transmission lines. The stronger winter winds enable the plant to generate more electricity at the time it is most needed. Indeed, the wind power plant at Searsburg, the largest east of the Mississippi River, is expected to have a positive effect on the environment by reducing the need to burn fossil fuels in other parts of New England. Green Mountain Power estimates that the electricity generated by the Searsburg plant will eliminate approximately 22 million pounds of air emissions per year that would have been generated by adding fossil fuel-burning capacity.
Zitieren
APA
Valenti, M. (1998). Proving Wind Power in New England. Mechanical Engineering. https://doi.org/10.1115/1.1998-aug-9
Vancouver
Valenti M. Proving Wind Power in New England. Mechanical Engineering. 1998. doi:10.1115/1.1998-aug-9
BibTeX
@article{Valenti1998,
author = {Valenti, Michael},
title = {Proving Wind Power in New England},
journal = {Mechanical Engineering},
year = {1998},
doi = {10.1115/1.1998-aug-9}
}