EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

An interval prediction system for track irregularity after tamping based on multi‐module machine learning and pointwise scaling approach

Yuxiao Zhang, Jin Shi, José Nuno Varandas, Youkang Ding

Computer-Aided Civil and Infrastructure Engineering · 2025-11 · 40 (27) · 4797-4823

DOI: 10.1111/mice.13504 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Computer-Aided Civil and Infrastructure Engineering, 2025-11. Verfasst von Yuxiao Zhang und 3 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 61 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0). Gefördert von: Natural Science Foundation of Beijing Municipality, Fundação para a Ciência e a Tecnologia.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Predicting changes in track irregularity after tamping is important for assisting maintenance decisions and improving construction efficiency. To date, most prediction methods lack consideration for the uncertainties related to tamping effects. To fill this gap, a multi‐module prediction interval system composed of feature selection, interval scaling, and intelligent predictor has been constructed. The feature selection module integrates the processes of relevance, redundancy, complementarity, and weighting. The interval scaling module assigns scaling factors to each point in a data‐driven manner, offering great flexibility. Research found that the composite model has significant advantages over traditional models, improving the interval coverage probability by 5.83%–40.62%. It can accurately predict the track relative smoothness after tamping, with the R2 between the measurement and the prediction of the 60 m mid‐chord offset reaching 0.95. This model can serve as a reliable and feasible tool for predicting the static irregularity of ballasted tracks after tamping.

Förderung

  • Natural Science Foundation of Beijing Municipality
  • Fundação para a Ciência e a Tecnologia

Zitieren

APA

Zhang, Y., Shi, J., Varandas, J. N., & Ding, Y. (2025). An interval prediction system for track irregularity after tamping based on multi‐module machine learning and pointwise scaling approach. Computer-Aided Civil and Infrastructure Engineering, 40(27), 4797-4823. https://doi.org/10.1111/mice.13504

Vancouver

Zhang Y, Shi J, Varandas JN, Ding Y. An interval prediction system for track irregularity after tamping based on multi‐module machine learning and pointwise scaling approach. Computer-Aided Civil and Infrastructure Engineering. 2025;40(27):4797-4823. doi:10.1111/mice.13504

BibTeX
@article{Zhang2025,
  author = {Zhang, Yuxiao and Shi, Jin and Varandas, José Nuno and Ding, Youkang},
  title = {An interval prediction system for track irregularity after tamping based on multi‐module machine learning and pointwise scaling approach},
  journal = {Computer-Aided Civil and Infrastructure Engineering},
  year = {2025},
  volume = {40},
  number = {27},
  pages = {4797--4823},
  doi = {10.1111/mice.13504}
}
Kostenlos starten →