EUVIMEDEUVIMED entdecken
Crossref

Sustainable‐collaborative scheduling of multi‐stage hybrid flowshop with heterogeneous production and transportation using a green scheduling strategy‐based NSGA‐II‐MFO algorithm

Jianguo Duan, Fangrong Chen, Mengyu Feng, Mengpei Yang, Yulin Du

International Transactions in Operational Research · 2026-05 · 33 (3) · 1733-1765

DOI: 10.1111/itor.13593 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Transactions in Operational Research, online erschienen am 18.12.2024. Verfasst von Jianguo Duan und 4 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 39 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The manufacturing of large metallic components typically involves cutting, welding, assembly, and machining, which consume a significant number of resources and result in substantial carbon emissions. In addition, there is a wide variety of intermediate parts in the production process, which is prone to the problem of kitting and long waiting times. The traditional single‐stage scheduling made it difficult to achieve overall production optimization. Furthermore, due to the large size of the workpiece, transportation equipment also consumes a significant amount of energy and generates carbon emissions during transportation. In heterogeneous hybrid flowshop, there is significant potential for optimizing the collaborative scheduling between processing machines and transportation equipment as well as between different transportation devices. This study presents a green scheduling model that considers the optimization of both the maximum makespan and the carbon emissions generated by the processing machines and transport equipment. The model also takes into account the idle state of the processing machines to further reduce carbon emissions. A green scheduling strategy is proposed to solve this model, along with an enhanced NSGA‐III (Non‐Dominated Sorting Genetic Algorithm III) that integrates the Moth‐Flame Optimization algorithm. Additionally, 15 arithmetic examples are provided to illustrate the manufacturing process of large metallic components of different scales. The effectiveness of the proposed algorithm is demonstrated through comparisons with commonly used intelligent optimization algorithms and non‐collaborative scheduling. The findings highlight the efficacy of collaborative scheduling in the heterogeneous multi‐stage hybrid flowshop for large metallic components, resulting in reduced manufacturing time and carbon emissions.

Zitieren

APA

Duan, J., Chen, F., Feng, M., Yang, M., & Du, Y. (2026). Sustainable‐collaborative scheduling of multi‐stage hybrid flowshop with heterogeneous production and transportation using a green scheduling strategy‐based NSGA‐II‐MFO algorithm. International Transactions in Operational Research, 33(3), 1733-1765. https://doi.org/10.1111/itor.13593

Vancouver

Duan J, Chen F, Feng M, Yang M, Du Y. Sustainable‐collaborative scheduling of multi‐stage hybrid flowshop with heterogeneous production and transportation using a green scheduling strategy‐based NSGA‐II‐MFO algorithm. International Transactions in Operational Research. 2026;33(3):1733-1765. doi:10.1111/itor.13593

BibTeX
@article{Duan2026,
  author = {Duan, Jianguo and Chen, Fangrong and Feng, Mengyu and Yang, Mengpei and Du, Yulin},
  title = {Sustainable‐collaborative scheduling of multi‐stage hybrid flowshop with heterogeneous production and transportation using a green scheduling strategy‐based NSGA‐II‐MFO algorithm},
  journal = {International Transactions in Operational Research},
  year = {2026},
  volume = {33},
  number = {3},
  pages = {1733--1765},
  doi = {10.1111/itor.13593}
}
Kostenlos starten →