In‐Service Inspection Optimization for Pressurized Water Reactor Primary Piping Weld Based on Probabilistic Fracture Mechanics
Fatigue & Fracture of Engineering Materials & Structures · 2026-03 · 49 (3) · 918-932
DOI: 10.1111/ffe.70159 ↗Kurz gefasst
Fachartikel in der Zeitschrift Fatigue & Fracture of Engineering Materials & Structures, online erschienen am 25.12.2025. Verfasst von Zhenshun Liu und 5 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 39 Literaturangaben. Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
Nuclear‐grade pipelines are essential for nuclear safety, and their failure can lead to severe accidents. Traditional deterministic methods tend to be overly conservative, overlook uncertainties in key factors, and struggle to accurately assess reliability under complex conditions. This paper aims to present a probabilistic fracture mechanics methodology to evaluate the reliability of circumferential cracks in primary piping welds under transient loads. A dedicated software tool, developed based on this method, calculates rupture and leakage probabilities by incorporating parameter uncertainties alongside deterministic fracture models. Furthermore, the influence of various in‐service inspection schedules on weld reliability is examined through case studies. The results indicate that excessively long inspection intervals result in actual failure probabilities at 60 years that exceed the safety goal of 10 −6 failures per year. In accordance with current ASME Code, Section XI, the first inspection should occur by the 10th year, while subsequent intervals may be optimized to every 20 years. Sensitivity analyses reveal that the initial crack depth and crack half‐angle have the greatest impact on probabilities, followed by the tensile strength, the safety factor, the yield strength, and the probability of detection model.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Liu, Z., Zeng, X., Li, X., Tan, J., Zheng, X. Y., & Liu, C. (2026). In‐Service Inspection Optimization for Pressurized Water Reactor Primary Piping Weld Based on Probabilistic Fracture Mechanics. Fatigue & Fracture of Engineering Materials & Structures, 49(3), 918-932. https://doi.org/10.1111/ffe.70159
Vancouver
Liu Z, Zeng X, Li X, Tan J, Zheng XY, Liu C. In‐Service Inspection Optimization for Pressurized Water Reactor Primary Piping Weld Based on Probabilistic Fracture Mechanics. Fatigue & Fracture of Engineering Materials & Structures. 2026;49(3):918-932. doi:10.1111/ffe.70159
BibTeX
@article{Liu2026,
author = {Liu, Zhenshun and Zeng, Xin and Li, Xinghua and Tan, Jianping and Zheng, Xiang Yuan and Liu, Changjun},
title = {In‐Service Inspection Optimization for Pressurized Water Reactor Primary Piping Weld Based on Probabilistic Fracture Mechanics},
journal = {Fatigue & Fracture of Engineering Materials & Structures},
year = {2026},
volume = {49},
number = {3},
pages = {918--932},
doi = {10.1111/ffe.70159}
}
EUVIMED