Socioenvironmental impacts of the Belo Monte hydroelectric power plant as revealed by Indigenous and ribeirinho monitoring

Josiel Jacinto Pereira Juruna, Raimundo da Cruz E Silva, Orcylene Barbosa Dos Reis, Amildon Moura Assunção, Anderson Sampaio da Silva, Helio Bezerra da Silva, Jailson Jacinto Pereira Juruna, Josimary Abreu Nunes, Micaele Souza Santos Kleme, Paulo Passos Ferreira, Ronald Txakui Viana da Silva Juruna, Rosilene Sousa Dos Santos und 20 weitere

Conservation Biology · 2025

DOI: 10.1111/cobi.70043 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Conservation Biology, 2025. Verfasst von Josiel Jacinto Pereira Juruna und 31 weiteren Autor:innen. Beteiligte Einrichtung: Aldeia Mïratu, Paquiçamba Indigenous Land, Pará, Brazil. Hauptthemen laut MEDLINE: Power Plants, Conservation of Natural Resources, Environmental Monitoring, Fishes. Die Arbeit wurde bisher 13-mal zitiert (Crossref) und nennt 60 Literaturangaben. Gefördert von: Fundo CASA, Conselho Nacional de Desenvolvimento Científico e Tecnológico, German Federal Ministry of Education and Research.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Hydroelectric dams, once seen as clean and renewable energy sources, have been the subject of extensive research, particularly concerning their socioenvironmental impacts. The Belo Monte hydroelectric power plant (HPP) relies on the operation of 2 dams that divert water from a 130‐km stretch of the Xingu River to generate energy. The dam has disrupted the seasonal flooding cycle (flood pulse) along the Volta Grande do Xingu (VGX) and created a reduced discharge condition analogous to a prolonged and extreme dry season in the watershed. Before the Belo Monte HPP, local communities relied on the highly diverse and abundant fish assemblage supported by seasonal flooding of the ecosystem. Local VGX residents sought partnerships and established the Independent Territorial Environmental Monitoring Program (MATI‐VGX). Through this program, locals monitored fish spawning sites and fishing dynamics. This monitoring complemented and quantified local communities’ perceptions about the environmental impacts caused by the Belo Monte HPP. The HPP was associated with a water discharge shortage that critically undermined the river's capacity to sustain vital ecosystem processes that support local people's lives. Drastic transformations of traditional lifestyles, shifts in fishing practices, and a significant decline in fishing yield occurred that jeopardized food sovereignty and security. The Belo Monte HPP environmental licensing process ignored local ecological knowledge and the vital links among the river's flood pulse, the aquatic and seasonally flooded ecosystems, and the traditional lifestyles of VGX residents. To ensure the ecological sustainability of the VGX, the Belo Monte HPP operation needs to change to support key spawning areas, maintain water discharge, avoid short‐term water fluctuations, and emulate natural interannual discharge variability to mitigate flood pulse disruption. Local ecological knowledge should never be ignored in projects where local communities are the most affected. These communities should be central in decision‐making regarding socioenvironmental impact assessment, mitigation, and monitoring.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

Power PlantsConservation of Natural ResourcesEnvironmental MonitoringFishesRiversAnimalsFloodsEcosystem

Stichwörter der Autor:innen

Belo Monte hydroelectric power plantIndigenouscentral hidroeléctrica Belo Montecomunidades tradicionalesdesovefishing productivityimpacto socio‐ambientalindígenasproductividad pesqueraribeirinhossocioenvironmental impactsspawningtraditional communities产卵传统社区

Autor:innen und Institutionen

  • Aldeia Mïratu, Paquiçamba Indigenous Land, Pará, Brazil.
  • Goianinho, Volta Grande do Xingu, Pará, Brazil.
  • Bacajá, Volta Grande do Xingu, Pará, Brazil.
  • Ilha da Baleia, Volta Grande do Xingu, Pará, Brazil.
  • Nova Conquista, Volta Grande do Xingu, Pará, Brazil.
  • Pupekuri Aldeia, Paquiçamba Indigenous Land, Pará, Brazil.

ORCID-Profile: Camila Duarte Ritter

Förderung

  • Fundo CASA
  • Conselho Nacional de Desenvolvimento Científico e Tecnológico
  • German Federal Ministry of Education and Research
  • Ford Foundation
  • Fundação de Amparo à Pesquisa do Estado de São Paulo
  • Research Council of Finland
  • Instituto Socioambiental
  • Fundação Amazônia de Amparo à Estudos e Pesquisas do Estado do Pará

Zitieren

APA

Juruna, J. J. P., da Cruz E Silva, R., Dos Reis, O. B., Moura Assunção, A., Sampaio da Silva, A., Bezerra da Silva, H., Pereira Juruna, J. J., Abreu Nunes, J., Souza Santos Kleme, M., Passos Ferreira, P., Txakui Viana da Silva Juruna, R., Sousa Dos Santos, R., Rodrigues Lima, S., Bezerra Lima, S., Juruna da Cruz Pereira, T., Quaresma, A., Cunha de Queiroz, A., Oliveira Sawakuchi, A., Ribas, C. C., …, & Mantovanelli, T. R. (2025). Socioenvironmental impacts of the Belo Monte hydroelectric power plant as revealed by Indigenous and ribeirinho monitoring. Conservation Biology. https://doi.org/10.1111/cobi.70043

Vancouver

Juruna JJP, da Cruz E Silva R, Dos Reis OB, Moura Assunção A, Sampaio da Silva A, Bezerra da Silva H, et al. Socioenvironmental impacts of the Belo Monte hydroelectric power plant as revealed by Indigenous and ribeirinho monitoring. Conservation Biology. 2025. doi:10.1111/cobi.70043

BibTeX
@article{Juruna2025,
  author = {Juruna, Josiel Jacinto Pereira and da Cruz E Silva, Raimundo and Dos Reis, Orcylene Barbosa and Moura Assunção, Amildon and Sampaio da Silva, Anderson and Bezerra da Silva, Helio and Pereira Juruna, Jailson Jacinto and Abreu Nunes, Josimary and Souza Santos Kleme, Micaele and Passos Ferreira, Paulo and Txakui Viana da Silva Juruna, Ronald and Sousa Dos Santos, Rosilene and Rodrigues Lima, Sara and Bezerra Lima, Sebastião and Juruna da Cruz Pereira, Tarukawa and Quaresma, Adriano and Cunha de Queiroz, Alexya and Oliveira Sawakuchi, André and Ribas, Camila Cherem and Duarte Ritter, Camila and Costa Carneiro, Cristiane and Mileno Silva De Paula, Eder and Zuquim, Gabriela and Palmquist, Helena and Wahnfried, Ingo and Silva de Jesus, Jandessa and Muriel-Cunha, Janice and Zuanon, Jansen and Pezzuti, Juarez Carlos Brito and Silva de Medeiros, Marksuel Sandro and Lopes, Priscila F M and Mantovanelli, Thais Regina},
  title = {Socioenvironmental impacts of the Belo Monte hydroelectric power plant as revealed by Indigenous and ribeirinho monitoring},
  journal = {Conservation Biology},
  year = {2025},
  doi = {10.1111/cobi.70043}
}
Kostenlos starten →