Using Managed Aquifer Recharge to Defer High‐Capital‐Cost Investments and Avoid Lock‐In in Semi‐Arid Australia
Australian Journal of Agricultural and Resource Economics · 23.11.2026
DOI: 10.1111/1467-8489.70175 ↗Kurz gefasst
Fachartikel in der Zeitschrift Australian Journal of Agricultural and Resource Economics, online erschienen am 23.11.2026. Verfasst von John Kandulu. Die Arbeit nennt 40 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Australian Research Council, Commonwealth Scientific and Industrial Research Organisation.
Abstract (Originalsprache)
Water‐scarce regions must plan long‐lived infrastructure under uncertain inflows, drought risk and future demand. Single‐decision‐point benefit–cost analyses (BCAs) can understate the value of flexibility when large, irreversible water‐supply investments are assessed without explicitly representing future decision opportunities. This study re‐examines the 2016 decision to construct the A$491 million Murray River pipeline for Broken Hill, New South Wales and asks whether a managed aquifer recharge (MAR) first strategy could meet the city's long‐term water‐supply objective at lower expected cost while avoiding premature commitment to irreversible capital investment. We develop a stochastic real‐options benefit–cost framework over a 30‐year planning horizon. Across 10,000 Monte Carlo simulations, the historical single‐decision‐point pipeline policy is compared with an adaptive MAR‐first policy in which the pipeline is retained as a contingent option and exercised only if available supply falls below 2.5 GL for two consecutive years. The three possible adaptive outcomes are evaluated jointly as one decision strategy, weighted by their simulated frequencies. The model incorporates probabilistic supply and demand variation, capital and operating costs, salinity and greenhouse‐gas externalities, and lower‐tail reliability using Conditional Value at Risk (CVaR). The adaptive MAR‐first policy has an expected present value of costs (EPVC) of A$372.1 million, compared with A$621.4 million for the benchmark pipeline policy, an expected saving of A$249.3 million (40.1%). The pipeline is exercised in approximately 5% of adaptive‐policy futures and remains unexercised in approximately 95%. Mean annual available supply is 9.58 GL/year under the adaptive policy compared with 7.70 GL/year under the benchmark. In the lowest‐yield 5% of simulated outcomes, average annual available supply is 2.52 GL/year under the benchmark policy and approximately 5.20 GL/year under the adaptive policy. Both values remain below the representative 7.5 GL/year demand benchmark, meaning that extreme drought conditions can still produce supply shortfalls; however, the smaller gap under the adaptive policy indicates substantially reduced lower‐tail shortfall exposure. The results show that MAR‐led sequencing can improve the cost‐reliability trade‐off while reducing expected lifecycle cost and premature capital commitment under deep uncertainty.
Förderung
- Australian Research Council
- Commonwealth Scientific and Industrial Research Organisation
Zitieren
APA
Kandulu, J. (2026). Using Managed Aquifer Recharge to Defer High‐Capital‐Cost Investments and Avoid Lock‐In in Semi‐Arid Australia. Australian Journal of Agricultural and Resource Economics. https://doi.org/10.1111/1467-8489.70175
Vancouver
Kandulu J. Using Managed Aquifer Recharge to Defer High‐Capital‐Cost Investments and Avoid Lock‐In in Semi‐Arid Australia. Australian Journal of Agricultural and Resource Economics. 2026. doi:10.1111/1467-8489.70175
BibTeX
@article{Kandulu2026,
author = {Kandulu, John},
title = {Using Managed Aquifer Recharge to Defer High‐Capital‐Cost Investments and Avoid Lock‐In in Semi‐Arid Australia},
journal = {Australian Journal of Agricultural and Resource Economics},
year = {2026},
doi = {10.1111/1467-8489.70175}
}
EUVIMED