Reliability-Based Planning of Cable Layout for Offshore Wind Farm Electrical Collector System Considering Post-Fault Network Reconfiguration
IEEE Transactions on Sustainable Energy · 2025-01 · 16 (1) · 419-433
DOI: 10.1109/tste.2024.3462476 ↗Kurz gefasst
Fachartikel in der Zeitschrift IEEE Transactions on Sustainable Energy, 2025-01. Verfasst von Xiaochi Ding und 5 weiteren Autor:innen. Die Arbeit wurde bisher 24-mal zitiert (Crossref) und nennt 40 Literaturangaben. Gefördert von: National Natural Science Foundation of China, Excellent Youth Basic Research Fund of Shenzhen, Basic and Applied Basic Research Foundation of Guangdong Province.
Abstract (Originalsprache)
The electrical collector system (ECS) plays a crucial role in determining the performance of offshore wind farms (OWFs). Existing research has predominantly restricted ECS cable layouts to conventional radial or ring structures and employed graph theory heuristics for solutions. However, both economic efficiency and reliability of the OWFs heavily depend on their ECS structure, and the optimal ECS cable layout often deviates from typical configurations. In this context, this paper introduces a novel reliability-based ECS cable layout planning method for large-scale OWFs, employing a two-stage stochastic programming approach to address uncertainties of wind power and contingencies. To enhance reliability, the model incorporates optimal post-fault network reconfiguration strategies by adjusting wind turbine power supply paths through link cables. To tackle computation challenges arising from numerous contingency scenarios, a customized progressive contingency incorporation (CPCI) framework is developed to solve the model with higher efficiency by iteratively identifying non-trivial scenarios and solving the simplified problems. The convergence and optimality are theoretically proven. Numerical tests on several real-world OWFs validate the necessity of fully optimizing ECS structures and demonstrate the efficiency of the CPCI algorithm.
Förderung
- National Natural Science Foundation of China
- Excellent Youth Basic Research Fund of Shenzhen
- Basic and Applied Basic Research Foundation of Guangdong Province
Zitieren
APA
Ding, X., Du, Y., Shen, X., Wu, Q., Zhang, X., & Hatziargyriou, N. D. (2025). Reliability-Based Planning of Cable Layout for Offshore Wind Farm Electrical Collector System Considering Post-Fault Network Reconfiguration. IEEE Transactions on Sustainable Energy, 16(1), 419-433. https://doi.org/10.1109/tste.2024.3462476
Vancouver
Ding X, Du Y, Shen X, Wu Q, Zhang X, Hatziargyriou ND. Reliability-Based Planning of Cable Layout for Offshore Wind Farm Electrical Collector System Considering Post-Fault Network Reconfiguration. IEEE Transactions on Sustainable Energy. 2025;16(1):419-433. doi:10.1109/tste.2024.3462476
BibTeX
@article{Ding2025,
author = {Ding, Xiaochi and Du, Yunfei and Shen, Xinwei and Wu, Qiuwei and Zhang, Xuan and Hatziargyriou, Nikos D.},
title = {Reliability-Based Planning of Cable Layout for Offshore Wind Farm Electrical Collector System Considering Post-Fault Network Reconfiguration},
journal = {IEEE Transactions on Sustainable Energy},
year = {2025},
volume = {16},
number = {1},
pages = {419--433},
doi = {10.1109/tste.2024.3462476}
}
EUVIMED