EUVIMEDEUVIMED entdecken
Crossref

A Real-Time Robust Method for Post-Disaster Load Restoration of Coordinated Power-Transportation System With Vehicle-to-Grid Response

Houbo Xiong, Yan Xu, Zhao Yang Dong, Wei Gan, Chuangxin Guo, Mingyu Yan

IEEE Transactions on Smart Grid · 2025-07 · 16 (4) · 3195-3209

DOI: 10.1109/tsg.2025.3568619 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IEEE Transactions on Smart Grid, 2025-07. Verfasst von Houbo Xiong und 5 weiteren Autor:innen. Die Arbeit wurde bisher 26-mal zitiert (Crossref) und nennt 51 Literaturangaben. Gefördert von: National Natural Science Foundation of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

With the proliferation of electric vehicles (EVs), vehicle-to-grid (V2G) capability emerges as a potential resource for load restoration after a large disruption. This paper presents a real-time post-disaster load restoration method for the coordinated power distribution networks (PDN) and urban traffic networks (UTN) with V2G response. The multi-period restoration problem is modeled as a dynamic programming-based multi-stage robust optimization model, addressing uncertainties of renewable generation and traffic demands. It incorporates a dynamic traffic assignment scheme to characterize vehicle travels and V2G services within short time slots. Then, an improved robust dual dynamic programming algorithm is proposed to solve the multi-stage robust optimization problem. For online application, the solved value functions from each stage serve as per-period policies, leveraging knowledge of future uncertainties to quickly guide real-time load restoration through distributed resource dispatch, network reconfiguration, and V2G assignments. Numerical experiments with a 33-bus PDN and 20-road UTN, plus a real-world 91-bus PDN with 35-road UTN, validate the effectiveness of proposed restoration method.

Förderung

  • National Natural Science Foundation of China

Zitieren

APA

Xiong, H., Xu, Y., Dong, Z. Y., Gan, W., Guo, C., & Yan, M. (2025). A Real-Time Robust Method for Post-Disaster Load Restoration of Coordinated Power-Transportation System With Vehicle-to-Grid Response. IEEE Transactions on Smart Grid, 16(4), 3195-3209. https://doi.org/10.1109/tsg.2025.3568619

Vancouver

Xiong H, Xu Y, Dong ZY, Gan W, Guo C, Yan M. A Real-Time Robust Method for Post-Disaster Load Restoration of Coordinated Power-Transportation System With Vehicle-to-Grid Response. IEEE Transactions on Smart Grid. 2025;16(4):3195-3209. doi:10.1109/tsg.2025.3568619

BibTeX
@article{Xiong2025,
  author = {Xiong, Houbo and Xu, Yan and Dong, Zhao Yang and Gan, Wei and Guo, Chuangxin and Yan, Mingyu},
  title = {A Real-Time Robust Method for Post-Disaster Load Restoration of Coordinated Power-Transportation System With Vehicle-to-Grid Response},
  journal = {IEEE Transactions on Smart Grid},
  year = {2025},
  volume = {16},
  number = {4},
  pages = {3195--3209},
  doi = {10.1109/tsg.2025.3568619}
}
Kostenlos starten →