Two-Tower Transformer-Based Topology Identification Method Considering Actual Distribution Network Measurements
IEEE Transactions on Instrumentation and Measurement · 2026 · 75 · 2512416-2512416
DOI: 10.1109/tim.2026.3701102 ↗Kurz gefasst
Fachartikel in der Zeitschrift IEEE Transactions on Instrumentation and Measurement, 2026. Verfasst von Xin Su und 2 weiteren Autor:innen. Die Arbeit nennt 35 Literaturangaben. Gefördert von: China Southern Power Grid Company Ltd..
Abstract (Originalsprache)
To address the challenges of large measurement errors, extensive data missing, and weak observability in distribution networks, this article proposes a hybrid data- and model-driven topology identification (TI) method. This method integrates multiperiod partial switch measurements along with their remote signaling data and load measurements to construct a dual-tower transformer (DTT) imputation-identification model. The left tower leverages the self-attention mechanism to fuse temporal measurements and missing masks for estimating missing values, while the right tower employs the multihead attention mechanism to integrate imputed estimates with remote signaling data for TI. The two towers are jointly optimized through a composite loss function incorporating normally open switch constraints, and through multiple iterative updates, accurate TI is achieved while maintaining imputation accuracy. To enhance the reliability of identification results, a correction strategy for suspicious switch states is proposed. The sigmoid output values of the DTT model are used to calculate switch prediction confidence, low-confidence switches are filtered based on a threshold, and efficient correction is realized by combining state estimation with an enumeration method. Finally, the effectiveness of the proposed method is validated through IEEE standard test cases and practical examples.
Förderung
- China Southern Power Grid Company Ltd.
Zitieren
APA
Su, X., Yan, W., & Zhang, X. (2026). Two-Tower Transformer-Based Topology Identification Method Considering Actual Distribution Network Measurements. IEEE Transactions on Instrumentation and Measurement, 75, 2512416-2512416. https://doi.org/10.1109/tim.2026.3701102
Vancouver
Su X, Yan W, Zhang X. Two-Tower Transformer-Based Topology Identification Method Considering Actual Distribution Network Measurements. IEEE Transactions on Instrumentation and Measurement. 2026;75:2512416-2512416. doi:10.1109/tim.2026.3701102
BibTeX
@article{Su2026,
author = {Su, Xin and Yan, Wei and Zhang, Xu},
title = {Two-Tower Transformer-Based Topology Identification Method Considering Actual Distribution Network Measurements},
journal = {IEEE Transactions on Instrumentation and Measurement},
year = {2026},
volume = {75},
pages = {2512416--2512416},
doi = {10.1109/tim.2026.3701102}
}
EUVIMED