EUVIMEDEUVIMED entdecken
Crossref

Slack Categories for Managing Risks in the Delivery and Assembly of Engineer-to-Order Prefabricated Building Systems

Fernanda Saidelles Bataglin, Carlos Torres Formoso, Daniela Dietz Viana

IEEE Transactions on Engineering Management · 2024 · 71 · 14032-14045

DOI: 10.1109/tem.2024.3436563 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IEEE Transactions on Engineering Management, 2024. Verfasst von Fernanda Saidelles Bataglin und 2 weiteren Autor:innen. Die Arbeit wurde bisher 8-mal zitiert (Crossref) und nennt 84 Literaturangaben. Gefördert von: National Council Scientific and Technological Development, Academic Doctorate for Innovation Program.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Industrialization brings several advantages to the construction industry, which are strongly related to moving production activities to a controlled environment. By contrast, there are additional challenges in managing the overall construction process due to the combined effect of interdependence between off-site and on-site processes and uncertainty caused by internal and external factors. In the context of engineer-to-order (ETO) industrialized building systems, products are customer-specific and require continuous negotiations between the provider and the customer, making the system even more complex and requiring reliable information. The use of slack may be interpreted as a dimension of project risk management, offering opportunities to make production systems more responsive to the impacts of project complexity. However, in the context of ETO industrialized building systems, research on using slack is still scarce. The research work aims to devise a framework of slack categories to support planning and control systems for the delivery and assembly of ETO industrialized building systems. Regarding theoretical contributions, some connections were established between different categories of slack and some core concepts and principles of the lean production philosophy, such as production flow and pull production. This investigation also explores the use of some digital technologies, such as four-dimensional building information modeling.

Förderung

  • National Council Scientific and Technological Development
  • Academic Doctorate for Innovation Program

Zitieren

APA

Bataglin, F. S., Formoso, C. T., & Viana, D. D. (2024). Slack Categories for Managing Risks in the Delivery and Assembly of Engineer-to-Order Prefabricated Building Systems. IEEE Transactions on Engineering Management, 71, 14032-14045. https://doi.org/10.1109/tem.2024.3436563

Vancouver

Bataglin FS, Formoso CT, Viana DD. Slack Categories for Managing Risks in the Delivery and Assembly of Engineer-to-Order Prefabricated Building Systems. IEEE Transactions on Engineering Management. 2024;71:14032-14045. doi:10.1109/tem.2024.3436563

BibTeX
@article{Bataglin2024,
  author = {Bataglin, Fernanda Saidelles and Formoso, Carlos Torres and Viana, Daniela Dietz},
  title = {Slack Categories for Managing Risks in the Delivery and Assembly of Engineer-to-Order Prefabricated Building Systems},
  journal = {IEEE Transactions on Engineering Management},
  year = {2024},
  volume = {71},
  pages = {14032--14045},
  doi = {10.1109/tem.2024.3436563}
}
Kostenlos starten →