Joint Power and Bandwidth Allocation Scheme Based on Multi-Timescale Beam Hopping Scheduling for LEO Satellite Systems
IEEE Transactions on Communications · 2026 · 74 · 8916-8931
DOI: 10.1109/tcomm.2026.3690358 ↗Kurz gefasst
Fachartikel in der Zeitschrift IEEE Transactions on Communications, 2026. Verfasst von Ke Wang und 5 weiteren Autor:innen. Die Arbeit nennt 35 Literaturangaben. Gefördert von: National Key Research and Development Program of China, Science and Technology Project of China Southern Power Grid Co., Ltd, CIE-Smartchip Research Fund.
Abstract (Originalsprache)
Satellite systems have emerged as a key component of future 6G networks, where beam hopping is widely adopted to improve resource utilization under limited onboard power and bandwidth. However, due to the inherent timescale mismatch between beam scheduling and resource allocation, as well as the increased system complexity caused by wide-area coverage and flexible resource demands, efficient resource scheduling requires coordinated decision-making across multiple timescales while ensuring user-level QoS provisioning. This paper aims to address the three-dimensional coupling of resources in the beam, power, and frequency domains while satisfying heterogeneous user QoS requirements. The key idea is to establish a multi-timescale framework that decouples the original optimization problem in the temporal domain. Specifically, beam scheduling is performed over beam hopping time slots(BHTSs), while resource allocation are conducted over finer-grained user scheduling time slots. A verification approach is developed to provide theoretical justification for the proposed timescale decomposition and to ensure the consistency. Based on this framework, a weight-based search strategy is employed for beam hopping pattern (BHP) selection, and a block coordinate descent (BCD) method is adopted to iteratively optimize user-level resource allocation. The simulation results demonstrate that the proposed scheme significantly improves system throughput and service satisfaction quality compared to existing methods, while maintaining robust performance under heterogeneous traffic and delay-sensitive scenarios.
Förderung
- National Key Research and Development Program of China
- Science and Technology Project of China Southern Power Grid Co., Ltd
- CIE-Smartchip Research Fund
Zitieren
APA
Wang, K., Tang, Y., Kang, H., Lian, X., Tao, Y., & Lv, T. (2026). Joint Power and Bandwidth Allocation Scheme Based on Multi-Timescale Beam Hopping Scheduling for LEO Satellite Systems. IEEE Transactions on Communications, 74, 8916-8931. https://doi.org/10.1109/tcomm.2026.3690358
Vancouver
Wang K, Tang Y, Kang H, Lian X, Tao Y, Lv T. Joint Power and Bandwidth Allocation Scheme Based on Multi-Timescale Beam Hopping Scheduling for LEO Satellite Systems. IEEE Transactions on Communications. 2026;74:8916-8931. doi:10.1109/tcomm.2026.3690358
BibTeX
@article{Wang2026,
author = {Wang, Ke and Tang, Yuanyuan and Kang, Heng and Lian, Xuanhao and Tao, Ying and Lv, Tiejun},
title = {Joint Power and Bandwidth Allocation Scheme Based on Multi-Timescale Beam Hopping Scheduling for LEO Satellite Systems},
journal = {IEEE Transactions on Communications},
year = {2026},
volume = {74},
pages = {8916--8931},
doi = {10.1109/tcomm.2026.3690358}
}
EUVIMED