Spatial–Temporal Load Balancing and Coordination of Multi-Robot Stations
IEEE Transactions on Automation Science and Engineering · 2023-10 · 20 (4) · 2203-2214
DOI: 10.1109/tase.2022.3214567 ↗Kurz gefasst
Fachartikel in der Zeitschrift IEEE Transactions on Automation Science and Engineering, 2023-10. Verfasst von Edvin Åblad und 4 weiteren Autor:innen. Die Arbeit wurde bisher 16-mal zitiert (Crossref) und nennt 42 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0). Gefördert von: Project Smart Assembly 4.0 through the Swedish Foundation for Strategic Research, Sustainable Production Initiative and the Production Area of Advance at Chalmers University of Technology.
Abstract (Originalsprache)
Cycle time minimization in multi-robot manufacturing stations is computationally challenging. This is due to the many aspects that need to be accounted for, including assigning process tasks to robots, specifying robot configurations at tasks, sequencing, planning motions, and coordinating the robots to avoid collisions. Hence, to find good solutions, often some assumptions are made and/or the problem is divided into subproblems—often limiting the set of solutions with the risk of excluding the best ones. In this study, we generalize the completely disjoint solution method that challenges the so-called shortest path assumption, i.e., to let each robot use its shortest collision-free motion between any two configurations, regardless of the other robots. We devise a generalized method called spatial–temporal load balancing and coordination, which prevents robot–robot collisions by a sequence of disjoint solutions, guiding task assignments, sequences, and robot motions (path and velocity). We study both artificial and industrial instances. For some of them, our suggested method is superior to methods based on the shortest path assumption, with as much as a 28% reduction in cycle time. Moreover, for problem instances with no special structure, we establish that the shortest path assumption is often reasonable. Note to Practitioners—This work is motivated by a particular industrial problem instance of a spot-welding station with two robots and where welds are placed along the edge of a workpiece. Due to the special geometry of the instance one robot can only perform welds in the middle of the edge and the other only at the ends. As a result, if the robots use their shortest motions between welds, then waiting times are required to prevent collisions. Moreover, the tasks are too close to each other to allow for a completely disjoint solution. Hence, we suggest a method based on sequence of disjoint solutions.
Förderung
- Project Smart Assembly 4.0 through the Swedish Foundation for Strategic Research
- Sustainable Production Initiative and the Production Area of Advance at Chalmers University of Technology
Zitieren
APA
Åblad, E., Spensieri, D., Bohlin, R., Carlson, J. S., & Strömberg, A. (2023). Spatial–Temporal Load Balancing and Coordination of Multi-Robot Stations. IEEE Transactions on Automation Science and Engineering, 20(4), 2203-2214. https://doi.org/10.1109/tase.2022.3214567
Vancouver
Åblad E, Spensieri D, Bohlin R, Carlson JS, Strömberg A. Spatial–Temporal Load Balancing and Coordination of Multi-Robot Stations. IEEE Transactions on Automation Science and Engineering. 2023;20(4):2203-2214. doi:10.1109/tase.2022.3214567
BibTeX
@article{blad2023,
author = {Åblad, Edvin and Spensieri, Domenico and Bohlin, Robert and Carlson, Johan S. and Strömberg, Ann-Brith},
title = {Spatial–Temporal Load Balancing and Coordination of Multi-Robot Stations},
journal = {IEEE Transactions on Automation Science and Engineering},
year = {2023},
volume = {20},
number = {4},
pages = {2203--2214},
doi = {10.1109/tase.2022.3214567}
}