EUVIMEDEUVIMED entdecken
Crossref

Wired for Growth: Planning for Data Centers at Entergy

Maryclaire Peterson, Katherine McCulla, Sharma Kolluri, Olumide Aluko

IEEE Power and Energy Magazine · 2026-03 · 24 (2) · 16-29

DOI: 10.1109/mpe.2025.3638729 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IEEE Power and Energy Magazine, 2026-03. Verfasst von Maryclaire Peterson und 3 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 4 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Maintaining transmission system reliability is becoming increasingly complex as utilities face unprecedented data center interconnection requests. These requests rival the scale of major generation projects, with individual sites exceeding thousands of megawatts and overall demand rising sharply. Proprietary designs, reliance on power electronic equipment, and uncertain dynamic behavior distinguish data centers from traditional industrial customers. This paper highlights the need for advanced modeling, early collaboration with developers, and updated planning practices to ensure reliable integration of these facilities into the grid.

Zitieren

APA

Peterson, M., McCulla, K., Kolluri, S., & Aluko, O. (2026). Wired for Growth: Planning for Data Centers at Entergy. IEEE Power and Energy Magazine, 24(2), 16-29. https://doi.org/10.1109/mpe.2025.3638729

Vancouver

Peterson M, McCulla K, Kolluri S, Aluko O. Wired for Growth: Planning for Data Centers at Entergy. IEEE Power and Energy Magazine. 2026;24(2):16-29. doi:10.1109/mpe.2025.3638729

BibTeX
@article{Peterson2026,
  author = {Peterson, Maryclaire and McCulla, Katherine and Kolluri, Sharma and Aluko, Olumide},
  title = {Wired for Growth: Planning for Data Centers at Entergy},
  journal = {IEEE Power and Energy Magazine},
  year = {2026},
  volume = {24},
  number = {2},
  pages = {16--29},
  doi = {10.1109/mpe.2025.3638729}
}
Kostenlos starten →