EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation

Shiming Yang, Leilei Meng, Saif Ullah, Biao Zhang, Hongyan Sang, Peng Duan

IEEE Access · 2025 · 13 · 25369-25386

DOI: 10.1109/access.2025.3535825 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IEEE Access, 2025. Verfasst von Shiming Yang und 5 weiteren Autor:innen. Die Arbeit wurde bisher 17-mal zitiert (Crossref) und nennt 44 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Funds for the National Natural Science Foundation of China, Natural Science Foundation of Shandong Province, Youth Innovation Team Program of Shandong Higher Education Institution.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Förderung

  • Funds for the National Natural Science Foundation of China
  • Natural Science Foundation of Shandong Province
  • Youth Innovation Team Program of Shandong Higher Education Institution
  • Guangyue Youth Scholar Innovation Talent Program funded Liaocheng University
  • Foundation of Young Talent of Lifting Engineering for Science and Technology in Shandong, China

Zitieren

APA

Yang, S., Meng, L., Ullah, S., Zhang, B., Sang, H., & Duan, P. (2025). MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation. IEEE Access, 13, 25369-25386. https://doi.org/10.1109/access.2025.3535825

Vancouver

Yang S, Meng L, Ullah S, Zhang B, Sang H, Duan P. MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation. IEEE Access. 2025;13:25369-25386. doi:10.1109/access.2025.3535825

BibTeX
@article{Yang2025,
  author = {Yang, Shiming and Meng, Leilei and Ullah, Saif and Zhang, Biao and Sang, Hongyan and Duan, Peng},
  title = {MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation},
  journal = {IEEE Access},
  year = {2025},
  volume = {13},
  pages = {25369--25386},
  doi = {10.1109/access.2025.3535825}
}
Kostenlos starten →