BIM implementation for Nigeria’s polytechnic built environment undergraduates: challenges and possible measures from stakeholders
Facilities · 16.12.2024 · 42 (15/16) · 70-91
DOI: 10.1108/f-07-2023-0058 ↗Kurz gefasst
Fachartikel in der Zeitschrift Facilities, online erschienen am 26.03.2024. Verfasst von Andrew Ebekozien und 4 weiteren Autor:innen. Die Arbeit wurde bisher 7-mal zitiert (Crossref) und nennt 78 Literaturangaben.
Abstract (Originalsprache)
Purpose
Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit. Design/methodology/approach Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.
Findings
Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment. Research limitations/implications This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates. Originality/value This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.
Zitieren
APA
Ebekozien, A., Aigbavboa, C., Samsurijan, M. S., Azazi, N. A. N., & Duru, O. D. S. (2024). BIM implementation for Nigeria’s polytechnic built environment undergraduates: challenges and possible measures from stakeholders. Facilities, 42(15/16), 70-91. https://doi.org/10.1108/f-07-2023-0058
Vancouver
Ebekozien A, Aigbavboa C, Samsurijan MS, Azazi NAN, Duru ODS. BIM implementation for Nigeria’s polytechnic built environment undergraduates: challenges and possible measures from stakeholders. Facilities. 2024;42(15/16):70-91. doi:10.1108/f-07-2023-0058
BibTeX
@article{Ebekozien2024,
author = {Ebekozien, Andrew and Aigbavboa, Clinton and Samsurijan, Mohamad Shaharudin and Azazi, Noor Alyani Nor and Duru, Okechukwu Dominic Saviour},
title = {BIM implementation for Nigeria’s polytechnic built environment undergraduates: challenges and possible measures from stakeholders},
journal = {Facilities},
year = {2024},
volume = {42},
number = {15/16},
pages = {70--91},
doi = {10.1108/f-07-2023-0058}
}
EUVIMED