EUVIMEDEUVIMED entdecken
Crossref

Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana

Francis Nuako, Frank Ato Ghansah, Thomas Adusei

Construction Innovation · 02.01.2026 · 26 (1) · 44-62

DOI: 10.1108/ci-07-2022-0176 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Construction Innovation, online erschienen am 25.03.2024. Verfasst von Francis Nuako und 2 weiteren Autor:innen. Die Arbeit wurde bisher 16-mal zitiert (Crossref) und nennt 74 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?” Design/methodology/approach This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana. Practical implications When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment. Originality/value The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Zitieren

APA

Nuako, F., Ghansah, F. A., & Adusei, T. (2026). Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana. Construction Innovation, 26(1), 44-62. https://doi.org/10.1108/ci-07-2022-0176

Vancouver

Nuako F, Ghansah FA, Adusei T. Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana. Construction Innovation. 2026;26(1):44-62. doi:10.1108/ci-07-2022-0176

BibTeX
@article{Nuako2026,
  author = {Nuako, Francis and Ghansah, Frank Ato and Adusei, Thomas},
  title = {Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana},
  journal = {Construction Innovation},
  year = {2026},
  volume = {26},
  number = {1},
  pages = {44--62},
  doi = {10.1108/ci-07-2022-0176}
}
Kostenlos starten →