Quantifying the uncertainty associated with extreme weather likelihood estimates derived from large model ensembles
Environmental Research Letters · 14.07.2026 · 21 (13) · 134041
DOI: 10.1088/1748-9326/ae860d ↗Kurz gefasst
Fachartikel in der Zeitschrift Environmental Research Letters, online erschienen am 10.07.2026. Verfasst von Damien Irving und 6 weiteren Autor:innen. Die Arbeit nennt 43 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Australian Climate Service.
Abstract (Originalsprache)
Effective risk management of weather and climate hazards requires robust estimates of the likelihood of occurrence. The most common tool for this is extreme value analysis (EVA), but likelihood estimates based on observed data can be highly uncertain due to the relatively short observational record. Substantially larger samples of plausible extreme weather events can be obtained using the UNprecedented Simulated Extremes using ENsembles (UNSEEN) approach, which involves applying EVA to large forecast/hindcast ensembles. While larger sample sizes generally reduce the sampling uncertainty associated with EVA, using seasonal or decadal forecast data introduces additional uncertainties related to bias correction and model diversity. In this study, a multi-model ensemble of hindcast data from the decadal Climate Prediction Project was analysed to quantify these additional uncertainties in the context of extreme temperature and rainfall across Australia. Factoring in bias correction and model diversity dramatically increased the uncertainty attributed to estimated event likelihoods from the UNSEEN approach. Model diversity tended to be the largest source of uncertainty (typically 50%–70% of the total). Bias correction was also a significant source of uncertainty (30%–50%), while the uncertainty associated with sample size was negligible in comparison. Our results suggest that multi-model analysis should become a standard part of any UNSEEN workflow. The UNSEEN-based approach to estimating the likelihood of climate extremes should be understood as an approach that has different uncertainty characteristics to an observation-based approach, as opposed to less uncertainty.
Förderung
- Australian Climate Service
Zitieren
APA
Irving, D., Stellema, A., Monselesan, D. P., Parker, T., Ramesh, N., Tozer, C. R., & Risbey, J. S. (2026). Quantifying the uncertainty associated with extreme weather likelihood estimates derived from large model ensembles. Environmental Research Letters, 21(13), 134041. https://doi.org/10.1088/1748-9326/ae860d
Vancouver
Irving D, Stellema A, Monselesan DP, Parker T, Ramesh N, Tozer CR, et al. Quantifying the uncertainty associated with extreme weather likelihood estimates derived from large model ensembles. Environmental Research Letters. 2026;21(13):134041. doi:10.1088/1748-9326/ae860d
BibTeX
@article{Irving2026,
author = {Irving, Damien and Stellema, Annette and Monselesan, Didier P and Parker, Tess and Ramesh, Nandini and Tozer, Carly R and Risbey, James S},
title = {Quantifying the uncertainty associated with extreme weather likelihood estimates derived from large model ensembles},
journal = {Environmental Research Letters},
year = {2026},
volume = {21},
number = {13},
pages = {134041},
doi = {10.1088/1748-9326/ae860d}
}
EUVIMED