EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Recent achievements at the ITER Neutral Beam Test Facility, and mission within the ITER research plan

Diego Marcuzzi, Emanuele Sartori, Marco Boldrin, Giuseppe Chitarin, Samuele Dal Bello, Luca Grando, Roberto Pasqualotto, Mauro Pavei, Gianluigi Serianni, Vanni Toigo, Loris Zanotto, Luca Trevisan und 8 weitere

Nuclear Fusion · 18.11.2026

DOI: 10.1088/1741-4326/aec3bc ↗

Kurz gefasst

Fachartikel in der Zeitschrift Nuclear Fusion, online erschienen am 18.11.2026. Verfasst von Diego Marcuzzi und 19 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Heating and Current Drive Neutral Beam Injectors in ITER will be essential in the DT phase to reach burning plasma condition and control advanced scenarios, providing at least 33 MW of heating power by neutral beams of hydrogen (0.87 MeV) or deuterium (1 MeV).
The operation of a full-scale negative ion source (SPIDER) and a complete injector prototype
(MITICA) are being validated at the Neutral Beam Test Facility (NBTF) in Padova, Italy,
within a long-term strategy integrated with the revised ITER Research Plan. Following its
first major shutdown, SPIDER completed a validation campaign (SO-2), operating 320
beamlets simultaneously for the first time, reaching ⁓700 kW beam power and an extracted
current density of 215 A/m2 in hydrogen at 0.3 Pa and RF power of 72 kW/driver – in line
with the scaling towards ITER target – together with a substantial increase in pulse duration.
Meanwhile, MITICA completed a dedicated campaign on high voltage insulation in vacuum,
demonstrating equivalent voltage holding up to 910 kV at HNB-relevant pressure using an
intermediate electrostatic shield, a result directly relevant to the 870 kV target. The
restoration and improvement process of the MITICA power supply, damaged during the first
integrated tests, is in its final phase ahead of the repetition of the full integrated tests.

Zitieren

APA

Marcuzzi, D., Sartori, E., Boldrin, M., Chitarin, G., Bello, S. D., Grando, L., Pasqualotto, R., Pavei, M., Serianni, G., Toigo, V., Zanotto, L., Trevisan, L., Veltri, P., Boilson, D., Tobari, H., Singh, M., King, D., Muraro, A., Deambrosis, S. M., & Fantz, U. (2026). Recent achievements at the ITER Neutral Beam Test Facility, and mission within the ITER research plan. Nuclear Fusion. https://doi.org/10.1088/1741-4326/aec3bc

Vancouver

Marcuzzi D, Sartori E, Boldrin M, Chitarin G, Bello SD, Grando L, et al. Recent achievements at the ITER Neutral Beam Test Facility, and mission within the ITER research plan. Nuclear Fusion. 2026. doi:10.1088/1741-4326/aec3bc

BibTeX
@article{Marcuzzi2026,
  author = {Marcuzzi, Diego and Sartori, Emanuele and Boldrin, Marco and Chitarin, Giuseppe and Bello, Samuele Dal and Grando, Luca and Pasqualotto, Roberto and Pavei, Mauro and Serianni, Gianluigi and Toigo, Vanni and Zanotto, Loris and Trevisan, Luca and Veltri, Pierluigi and Boilson, Deirdre and Tobari, Hiroyuki and Singh, Mahendrajit and King, Damian and Muraro, Andrea and Deambrosis, Silvia Maria and Fantz, Ursel},
  title = {Recent achievements at the ITER Neutral Beam Test Facility, and mission within the ITER research plan},
  journal = {Nuclear Fusion},
  year = {2026},
  doi = {10.1088/1741-4326/aec3bc}
}
Kostenlos starten →