Fachartikel in der Zeitschrift Metrologia, online erschienen am 04.11.2026. Verfasst von Siyao Wang und 8 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: China Postdoctoral Science Foundation, National Natural Science Foundation of China, Chengdu Municipal Science and Technology Program.
Abstract (Originalsprache)
Day-boundary discontinuities at 00:00 in daily GNSS orbit and clock products can introduce nanosecond-level jumps into precise point positioning (PPP) clock estimates and degrade the continuity of station-to-station time transfer. Leveraging recently released “0 to 0” products, this study proposes a new processing strategy that explicitly uses the precisely determined day-boundary jumps. The method first computes the satellite-wise orbit and clock discontinuities at 00:00 from two consecutive “0 to 0” files, then distributes these jumps over a short correction interval on the second day and applies a small process noise to the ionosphere-free ambiguities so that they gradually absorb the residual boundary-induced errors. The approach is implemented within a PPP time-transfer framework and evaluated using 31 days of COD final and GBM rapid products, together with GPS and Galileo observations from four IGS stations forming three time-transfer links. Conventional PPP processing produces clock jumps ranging from less than 1 ns to approximately 6 ns. The proposed method effectively removes these discontinuities while preserving subsequent clock variations. For the three links, the mean absolute difference between the results at 00:00:00 and 00:00:30 decreases from 0.056-0.225 ns to 0.012-0.027 ns, corresponding to reductions of approximately 79-93%. The corrected results are also consistent with COD precise receiver-clock products within 1 ns. These findings demonstrate that the proposed strategy provides a practical way to achieve nanosecond-level continuity across day boundaries in GNSS-based time transfer.
Förderung
- China Postdoctoral Science Foundation
- National Natural Science Foundation of China
- Chengdu Municipal Science and Technology Program
- Space Application System of the China Manned Space Program
- National Key Research and Development Program of China
Zitieren
APA
Wang, S., Guo, Y., Zhang, R., Kaponja, J., Sikirica, N., Gao, S., Gao, Y., Tu, R., & Lu, X. (2026). Day-boundary discontinuity elimination method of PPP time transfer with “0 to 0” orbit and clock products. Metrologia. https://doi.org/10.1088/1681-7575/aebd9b
Vancouver
Wang S, Guo Y, Zhang R, Kaponja J, Sikirica N, Gao S, et al. Day-boundary discontinuity elimination method of PPP time transfer with “0 to 0” orbit and clock products. Metrologia. 2026. doi:10.1088/1681-7575/aebd9b
BibTeX
@article{Wang2026,
author = {Wang, Siyao and Guo, Yanming and Zhang, runzhi and Kaponja, Jurica and Sikirica, Nenad and Gao, Shuaihe and Gao, Yuping and Tu, Rui and Lu, Xiaochun},
title = {Day-boundary discontinuity elimination method of PPP time transfer with “0 to 0” orbit and clock products},
journal = {Metrologia},
year = {2026},
doi = {10.1088/1681-7575/aebd9b}
}
EUVIMED