Ghana’s Bui Hydropower Dam and Linkage Creation Challenges
Forum for Development Studies · 02.01.2021 · 48 (1) · 153-174
DOI: 10.1080/08039410.2020.1858953 ↗Kurz gefasst
Fachartikel in der Zeitschrift Forum for Development Studies, online erschienen am 15.12.2020. Verfasst von Kwame Adovor Tsikudo. Die Arbeit wurde bisher 9-mal zitiert (Crossref) und nennt 80 Literaturangaben.
Abstract (Originalsprache)
This study examines the issues of linkage development pertaining to the Bui Hydropower Dam. 1 Completed in 2013, the 400-megawatt hydropower facility was touted by the government to catalyse Ghana’s socio-economic transformation. However, while the Chinese contractor delivered the physical edifice to the Ghanaian government, the dam’s material benefits have yet to materialize. The inability to instigate economic linkages from the project has sparked debate in research and policy circles in Ghana. While some scholars reference local factors, others cite external elements, including the demands of Chinese actors and financiers as the cause of the limited economic linkages the dam created in the Ghanaian economy. This paper explores these counterpropositions. Drawing from exploratory mixed-method research, the paper asserts that although linkage creation is mediated by internal and external factors, the former is more salient when it comes to engagement with China.
Zitieren
APA
Tsikudo, K. A. (2021). Ghana’s Bui Hydropower Dam and Linkage Creation Challenges. Forum for Development Studies, 48(1), 153-174. https://doi.org/10.1080/08039410.2020.1858953
Vancouver
Tsikudo KA. Ghana’s Bui Hydropower Dam and Linkage Creation Challenges. Forum for Development Studies. 2021;48(1):153-174. doi:10.1080/08039410.2020.1858953
BibTeX
@article{Tsikudo2021,
author = {Tsikudo, Kwame Adovor},
title = {Ghana’s Bui Hydropower Dam and Linkage Creation Challenges},
journal = {Forum for Development Studies},
year = {2021},
volume = {48},
number = {1},
pages = {153--174},
doi = {10.1080/08039410.2020.1858953}
}
EUVIMED