EUVIMEDEUVIMED entdecken
Crossref

Session 11. Oral Presentation for: Pipeline operability and flow assurance challenges in a late life asset: insights from gas production in Bass Strait

Hugo B. Burgin, Daniel Liang

Australian Energy Producers Journal · 18.06.2026 · 66 (S2)

DOI: 10.1071/ep26403 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Australian Energy Producers Journal, online erschienen am 18.06.2026. Verfasst von Hugo B. Burgin und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Presented on 20 May 2026: Session 11 Natural gas production from Bass Strait and the Longford Gas Plants commenced in 1969, and in 2024, operations continued to supply approximately 40% of Eastern Australia’s domestic gas demand. As part of a major asset streamlining process undertaken in late 2024 due to declining reserves, all onshore and offshore facilities and pipelines supporting oil production and redundant gas processing capacity were shut-in for production purposes, leaving six gas platforms and two subsea tiebacks – connected via an extensive pipeline network – online. The streamlining process has delivered greater operational flexibility and business advantages; however, it has also introduced several interconnected engineering challenges, including issues related to gas pipeline flow assurance, and the operability of the asset’s two main multi-phase trunklines: the SNA600 and the MLA500. This extended abstract focuses on what has been learnt while addressing two of these challenges: liquid slugging caused by increased volumes of liquid held up in the SNA600 and MLA500 trunklines, and the reliability of the basin’s closed-loop glycol supply system. The Longford Gas Plant and the producing platforms in Bass Strait are owned by ExxonMobil (50%) and Woodside (50%) and are operated by ExxonMobil. To access the Oral Presentation click ‘Supplementary data’ below. To read the full paper click here

Zitieren

APA

Burgin, H. B., & Liang, D. (2026). Session 11. Oral Presentation for: Pipeline operability and flow assurance challenges in a late life asset: insights from gas production in Bass Strait. Australian Energy Producers Journal, 66(S2). https://doi.org/10.1071/ep26403

Vancouver

Burgin HB, Liang D. Session 11. Oral Presentation for: Pipeline operability and flow assurance challenges in a late life asset: insights from gas production in Bass Strait. Australian Energy Producers Journal. 2026;66(S2). doi:10.1071/ep26403

BibTeX
@article{Burgin2026,
  author = {Burgin, Hugo B. and Liang, Daniel},
  title = {Session 11. Oral Presentation for: Pipeline operability and flow assurance challenges in a late life asset: insights from gas production in Bass Strait},
  journal = {Australian Energy Producers Journal},
  year = {2026},
  volume = {66},
  number = {S2},
  doi = {10.1071/ep26403}
}
Kostenlos starten →