EUVIMEDEUVIMED entdecken
Crossref

Accelerating deepwater gas: strategies for fast-track field development

Matthew Burgess

Australian Energy Producers Journal · 14.05.2026 · 66 (S1)

DOI: 10.1071/ep25125 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Australian Energy Producers Journal, online erschienen am 14.05.2026. Verfasst von Matthew Burgess. Die Arbeit nennt 1 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

As the number of potential deepwater gas developments grows, operators are aiming to accelerate production timelines to unlock maximum value. Traditionally, field development planning prioritises extended early-phase studies to optimise cost and outcomes. However, this can conflict with fast-track schedules. This paper presents strategies from project experience for executing a short-duration Concept Selection and Pre-Front End Engineering Design (FEED) study that enables critical decision-making while supporting accelerated development, using a representative remote deepwater gas opportunity as a case study. In Concept Selection, a streamlined approach is proposed; endorsing appraise stage work via traffic light grading, reworking only flagged areas to confirm technical feasibility and validating cost and schedule inputs to support a focused selection workshop. During Pre-FEED, an integrated strategy prioritises decisions – such as field layout configurations, hydrate management and processing options – allowing progress at pace. Key enablers include digitalisation to evaluate multiple scenarios, proactive management of change and early contractor engagement to maintain schedule integrity. While taking sufficient time in early project phases remains best practice, this paper demonstrates how targeted strategies can balance speed with rigour. By focusing on high-impact decisions and leveraging digital tools, operators can maintain development quality without compromising timelines. These insights offer practical guidance for navigating the tension between conventional planning and fast-track execution, helping operators unlock maximum value from deepwater gas opportunities.

Zitieren

APA

Burgess, M. (2026). Accelerating deepwater gas: strategies for fast-track field development. Australian Energy Producers Journal, 66(S1). https://doi.org/10.1071/ep25125

Vancouver

Burgess M. Accelerating deepwater gas: strategies for fast-track field development. Australian Energy Producers Journal. 2026;66(S1). doi:10.1071/ep25125

BibTeX
@article{Burgess2026,
  author = {Burgess, Matthew},
  title = {Accelerating deepwater gas: strategies for fast-track field development},
  journal = {Australian Energy Producers Journal},
  year = {2026},
  volume = {66},
  number = {S1},
  doi = {10.1071/ep25125}
}
Kostenlos starten →