Two Decades of Embodied Carbon in MENA’s Construction Sector: Regional Insights and Policy Implications
Journal of Construction Engineering and Management · 01.10.2026 · 152 (10)
DOI: 10.1061/jcemd4.coeng-18308 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Construction Engineering and Management, erschienen am 01.10.2026. Verfasst von Laila Essaghouri und 4 weiteren Autor:innen. Die Arbeit nennt 68 Literaturangaben.
Abstract (Originalsprache)
The construction sector is a major contributor to global CO 2 emissions, yet embodied emissions in construction supply chains remain poorly quantified in the Middle East and North Africa (MENA), where hydrocarbon-based growth, rapid urbanization, and recurrent reconstruction have created one of the world’s most dynamic construction markets. This study develops a regionally disaggregated, trade-adjusted, consumption-based assessment of embodied carbon associated with construction final demand and upstream supply chains across 23 MENA economies (2000–2021). An environmentally extended multiregional input–output model based on the Eora26 database is combined with international CO 2 inventories to trace construction-related embodied emissions through domestic production and global supply chains. The framework separates domestic, intra-MENA, and extra-MENA embodied imports; quantifies supplier concentration (Herfindahl–Hirschman index, three- and five-supplier concentration ratios); and applies segmented-regression breakpoint analysis to relate emissions trajectories to macroeconomic, conflict, and sanctions episodes. Results show embodied construction emissions increased from 88.8 to 232.1 Mt CO 2 (2000–2021), totaling 3,498 Mt CO 2 cumulatively. Six system-shaper economies (Saudi Arabia, Turkey, Iran, UAE, Algeria, Egypt) account for about 70% of the total, while import-dependent economies (e.g., Kuwait, Israel) derive over half their construction footprint from imports. Construction materials and energy and water dominate the embodied footprint, with several countries exhibiting high carbon intensity per unit of construction output. Supplier portfolios are often highly concentrated, three to five partners provide most imported embodied CO 2 , exposing MENA construction to external decarbonization and carbon-border policies. The analysis establishes an empirically grounded typology of construction-emission archetypes across the region and highlights differentiated mitigation pathways: industrial decarbonization in system shapers; material efficiency in fast-growing latecomers; green trade governance in import-dependent economies; and low-carbon reconstruction in conflict-affected states.
Zitieren
APA
Essaghouri, L., Xu, F., Zhu, C., Aletoum, E., & Li, X. (2026). Two Decades of Embodied Carbon in MENA’s Construction Sector: Regional Insights and Policy Implications. Journal of Construction Engineering and Management, 152(10). https://doi.org/10.1061/jcemd4.coeng-18308
Vancouver
Essaghouri L, Xu F, Zhu C, Aletoum E, Li X. Two Decades of Embodied Carbon in MENA’s Construction Sector: Regional Insights and Policy Implications. Journal of Construction Engineering and Management. 2026;152(10). doi:10.1061/jcemd4.coeng-18308
BibTeX
@article{Essaghouri2026,
author = {Essaghouri, Laila and Xu, Feng and Zhu, Chen and Aletoum, Ehab and Li, Xiaodong},
title = {Two Decades of Embodied Carbon in MENA’s Construction Sector: Regional Insights and Policy Implications},
journal = {Journal of Construction Engineering and Management},
year = {2026},
volume = {152},
number = {10},
doi = {10.1061/jcemd4.coeng-18308}
}
EUVIMED