The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future
Journal of Construction Engineering and Management · 2023-05 · 149 (5)
DOI: 10.1061/jcemd4.coeng-12926 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Construction Engineering and Management, 2023-05. Verfasst von Yuxuan Zhou und 3 weiteren Autor:innen. Die Arbeit wurde bisher 16-mal zitiert (Crossref) und nennt 183 Literaturangaben.
Abstract (Originalsprache)
4 System Dynamics (SD) applications in high volume production operations is ubiquitous, helping to define decision 5 rules to reduce costs associated with the variance in planning orders and inventory. The exploitation of SD in 6 engineer-to-order (ETO) project-oriented supply chains, e.g., in construction, shipbuilding, and capital goods, is 7 less well established. Hence, this research reviews papers which take a systematic ETO perspective modelling 8 construction project, exploiting SD approaches. To comprehensively identify and filter previously published 9 papers, we use a keyword searching method using Web of Science and Scopus databases. After applying relevant 10 exclusion criteria, 145 papers are finally selected. While there have been previous reviews of ETO literature more 11 generally, this paper contributes to the body of knowledge by specifically reviewing SD applications in ETO 12 industries and providing insights by creating a categorization system by which to determine where existing gaps 13 reside. Papers are categorized into the classic four phases of a project: aggregated planning, pre-project planning, 14 project execution, and post-delivery phase. Analyses of the methods, attributes and applications of SD are 15 undertaken for each phase. Findings indicate that SD research covers the range of ETO industries of which 16 construction is the most dominant, demonstrating SD’s high applicability. The wealth of case-orientated research 17 in the construction field provides a solid foundation for further SD studies in the ETO field. Further research 18 should focus on 1) developing a general ETO archetype used for performance benchmarking and strategy 19 development in construction projects, 2) introducing analytical tools, such as control theoretic approaches as found 20 in manufacturing production planning and control design, to improve understanding of the ETO systems’ dynamic 21 behaviors, and 3) developing cross-phase, cross-project, design production integrated, aggregated planning models 22 via hybrid techniques modelling, which can contribute to a better understanding of an ETO system’s performance.
Zitieren
APA
Zhou, Y., Wang, X., Gosling, J., & Naim, M. M. (2023). The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future. Journal of Construction Engineering and Management, 149(5). https://doi.org/10.1061/jcemd4.coeng-12926
Vancouver
Zhou Y, Wang X, Gosling J, Naim MM. The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future. Journal of Construction Engineering and Management. 2023;149(5). doi:10.1061/jcemd4.coeng-12926
BibTeX
@article{Zhou2023,
author = {Zhou, Yuxuan and Wang, Xun and Gosling, Jonathan and Naim, Mohamed M.},
title = {The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future},
journal = {Journal of Construction Engineering and Management},
year = {2023},
volume = {149},
number = {5},
doi = {10.1061/jcemd4.coeng-12926}
}
EUVIMED