Distributionally Robust Optimal Scheduling of Cascaded Hydropower Plants Based on Shortfall Risk Measures
IET Renewable Power Generation · 2026-01 · 20 (1)
DOI: 10.1049/rpg2.70415 ↗Kurz gefasst
Fachartikel in der Zeitschrift IET Renewable Power Generation, online erschienen am 16.11.2026. Verfasst von Feifei Shen und 3 weiteren Autor:innen. Die Arbeit nennt 40 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0). Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
Rising renewable energy penetration has intensified electricity price volatility, threatening the revenue stability of cascade hydropower stations. We propose a scheduling model grounded in distributionally robust shortfall risk (DRO‐SR), a convex measure that captures extreme downside exposure while avoiding the excessive conservatism of conditional value‐at‐risk (CVaR) formulations. The model admits a tractable reformulation via Lagrangian duality. We prove that the data‐driven optimum converges almost surely to the true‐distribution optimum when the Wasserstein ambiguity radius decays appropriately with sample size, conferring large‐sample statistical validity. Applied to a four‐station cascade system in Southwest China, DRO‐SR achieves a risk–return efficiency of 172.5 ( per 1% revenue forgone), more than double that of DRO‐CVaR (78.1). It is the only model that satisfies the shortfall risk constraint. Under amplified out‐of‐sample price volatility, DRO‐SR improves by 6.34% at a cost of merely 0.61% expected revenue loss, substantially outperforming DRO‐CVaR (1.51% at 4.01% loss). The Wasserstein radius exhibits a sharp feasibility threshold (), and the risk budget shows diminishing returns beyond 36.2 million CNY, providing a self‐limiting robustness‐tuning mechanism. These results establish a statistically grounded framework for risk‐aware hydropower scheduling under electricity market uncertainty.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Shen, F., Ma, X., Lin, M., & Shen, J. (2026). Distributionally Robust Optimal Scheduling of Cascaded Hydropower Plants Based on Shortfall Risk Measures. IET Renewable Power Generation, 20(1). https://doi.org/10.1049/rpg2.70415
Vancouver
Shen F, Ma X, Lin M, Shen J. Distributionally Robust Optimal Scheduling of Cascaded Hydropower Plants Based on Shortfall Risk Measures. IET Renewable Power Generation. 2026;20(1). doi:10.1049/rpg2.70415
BibTeX
@article{Shen2026,
author = {Shen, Feifei and Ma, Xiaojun and Lin, Mengke and Shen, Jianjian},
title = {Distributionally Robust Optimal Scheduling of Cascaded Hydropower Plants Based on Shortfall Risk Measures},
journal = {IET Renewable Power Generation},
year = {2026},
volume = {20},
number = {1},
doi = {10.1049/rpg2.70415}
}
EUVIMED