Short Term Optimization Scheduling of Cascade Hydropower With Hybrid Pumped Storage and Wind‐PV Coordinated Operation
IET Renewable Power Generation · 2026-01 · 20 (1)
DOI: 10.1049/rpg2.70262 ↗Kurz gefasst
Fachartikel in der Zeitschrift IET Renewable Power Generation, online erschienen am 04.05.2026. Verfasst von Xin He und 5 weiteren Autor:innen. Die Arbeit nennt 36 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).
Abstract (Originalsprache)
The introduction of the “dual carbon” goals and the large‐scale integration of renewable energy sources such as wind and photovoltaic (PV) power have imposed higher requirements on the flexibility of power system dispatch. To address this issue, a short‐term optimal scheduling method is proposed for a cascade hybrid pumped storage power station integrated with wind and PV generation under transmission‐oriented operation scenarios. First, a joint generation system consisting of wind power, PV power, and cascade hybrid pumped storage stations is established. Then, a short‐term multi‐objective optimization model is formulated with the objectives of minimizing the peak–valley difference of residual load and maximizing the total output of the joint system. The non‐dominated sorting genetic algorithm II (NSGA‐II) is employed. Case studies show that during periods with abundant water and renewable energy resources, the peak–valley difference of residual load can be reduced by 31.32%, the total system output can be increased by 2432.75 MW, and the coefficient of variation of residual load can be reduced by 17.7%. These results demonstrate that the proposed method effectively enhances renewable energy accommodation capability and improves the operational flexibility of cascade hydropower systems.
Zitieren
APA
He, X., Wang, Q., Xie, J., Wang, H., Zhang, G., & Li, H. (2026). Short Term Optimization Scheduling of Cascade Hydropower With Hybrid Pumped Storage and Wind‐PV Coordinated Operation. IET Renewable Power Generation, 20(1). https://doi.org/10.1049/rpg2.70262
Vancouver
He X, Wang Q, Xie J, Wang H, Zhang G, Li H. Short Term Optimization Scheduling of Cascade Hydropower With Hybrid Pumped Storage and Wind‐PV Coordinated Operation. IET Renewable Power Generation. 2026;20(1). doi:10.1049/rpg2.70262
BibTeX
@article{He2026,
author = {He, Xin and Wang, Qin and Xie, Jiancang and Wang, Huan and Zhang, Gang and Li, Hua},
title = {Short Term Optimization Scheduling of Cascade Hydropower With Hybrid Pumped Storage and Wind‐PV Coordinated Operation},
journal = {IET Renewable Power Generation},
year = {2026},
volume = {20},
number = {1},
doi = {10.1049/rpg2.70262}
}
EUVIMED