Crossref
A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology
IET Conference Proceedings · 01.11.2026 · 2026 (23) · 90-94
DOI: 10.1049/icp.2026.4537 ↗Kurz gefasst
Fachartikel in der Zeitschrift IET Conference Proceedings, erschienen am 01.11.2026. Verfasst von Rui Pan und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Pan, R., & Guo, X. (2026). A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology. IET Conference Proceedings, 2026(23), 90-94. https://doi.org/10.1049/icp.2026.4537
Vancouver
Pan R, Guo X. A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology. IET Conference Proceedings. 2026;2026(23):90-94. doi:10.1049/icp.2026.4537
BibTeX
@article{Pan2026,
author = {Pan, Rui and Guo, Xiaona},
title = {A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology},
journal = {IET Conference Proceedings},
year = {2026},
volume = {2026},
number = {23},
pages = {90--94},
doi = {10.1049/icp.2026.4537}
}
EUVIMED