A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology

Rui Pan, Xiaona Guo

IET Conference Proceedings · 01.11.2026 · 2026 (23) · 90-94

DOI: 10.1049/icp.2026.4537 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IET Conference Proceedings, erschienen am 01.11.2026. Verfasst von Rui Pan und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Pan, R., & Guo, X. (2026). A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology. IET Conference Proceedings, 2026(23), 90-94. https://doi.org/10.1049/icp.2026.4537

Vancouver

Pan R, Guo X. A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology. IET Conference Proceedings. 2026;2026(23):90-94. doi:10.1049/icp.2026.4537

BibTeX
@article{Pan2026,
  author = {Pan, Rui and Guo, Xiaona},
  title = {A real-time perception and prediction method for nuclear power project construction progress deviations based on digital twin technology},
  journal = {IET Conference Proceedings},
  year = {2026},
  volume = {2026},
  number = {23},
  pages = {90--94},
  doi = {10.1049/icp.2026.4537}
}
Kostenlos starten →