Crossref
Crane scheduling method for steelmaking plants based on hierarchical reinforcement learning
IET Conference Proceedings · 01.11.2026 · 2026 (22) · 346-351
DOI: 10.1049/icp.2026.4438 ↗Kurz gefasst
Fachartikel in der Zeitschrift IET Conference Proceedings, erschienen am 01.11.2026. Verfasst von Haipeng Hu und 4 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Hu, H., Zhang, J., Rao, G., Bao, G., & Wu, H. (2026). Crane scheduling method for steelmaking plants based on hierarchical reinforcement learning. IET Conference Proceedings, 2026(22), 346-351. https://doi.org/10.1049/icp.2026.4438
Vancouver
Hu H, Zhang J, Rao G, Bao G, Wu H. Crane scheduling method for steelmaking plants based on hierarchical reinforcement learning. IET Conference Proceedings. 2026;2026(22):346-351. doi:10.1049/icp.2026.4438
BibTeX
@article{Hu2026,
author = {Hu, Haipeng and Zhang, Jikai and Rao, Gang and Bao, Guozhong and Wu, Hao},
title = {Crane scheduling method for steelmaking plants based on hierarchical reinforcement learning},
journal = {IET Conference Proceedings},
year = {2026},
volume = {2026},
number = {22},
pages = {346--351},
doi = {10.1049/icp.2026.4438}
}
EUVIMED