Crossref
Cause analysis and control of large expansion difference in steam turbine unit start up
IET Conference Proceedings · 01.05.2026 · 2025 (49) · 291-295
DOI: 10.1049/icp.2026.0733 ↗Kurz gefasst
Fachartikel in der Zeitschrift IET Conference Proceedings, erschienen am 01.05.2026. Verfasst von Zhi Jun Yan.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Yan, Z. J. (2026). Cause analysis and control of large expansion difference in steam turbine unit start up. IET Conference Proceedings, 2025(49), 291-295. https://doi.org/10.1049/icp.2026.0733
Vancouver
Yan ZJ. Cause analysis and control of large expansion difference in steam turbine unit start up. IET Conference Proceedings. 2026;2025(49):291-295. doi:10.1049/icp.2026.0733
BibTeX
@article{Yan2026,
author = {Yan, Zhi Jun},
title = {Cause analysis and control of large expansion difference in steam turbine unit start up},
journal = {IET Conference Proceedings},
year = {2026},
volume = {2025},
number = {49},
pages = {291--295},
doi = {10.1049/icp.2026.0733}
}
EUVIMED