EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Uncertainty‐Quantified Probabilistic Forecasting and Reinforcement Learning for Short‐Term Hydropower Scheduling

Xin Wang, Zengchao Wang, Yuan La

IET Cyber-Physical Systems: Theory & Applications · 2026-01 · 11 (1)

DOI: 10.1049/cps2.70042 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IET Cyber-Physical Systems: Theory & Applications, online erschienen am 25.05.2026. Verfasst von Xin Wang und 2 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 23 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Short‐term hydropower scheduling is inherently affected by uncertainties in both inflow and electricity demand, which challenge the reliability of management strategies. Deterministic approaches struggle to maintain feasible and economically efficient schedules, especially when a rare or extreme scenario occurs. In this paper, an integrated framework combining probabilistic forecasting with safe reinforcement learning is proposed to enhance the short‐term hydropower scheduling strategy. LightGBM and temporal fusion transformer are combined into a multimodel forecasting layer to generate calibrated probabilistic predictions. The forecasts are transformed into risk‐aware constraints for a deep reinforcement learning agent to optimise reservoir operations. Experiments under three different scenarios are conducted to demonstrate the effectiveness of the proposed framework. Probabilistic forecasting provides well‐calibrated uncertainty bounds that adapt to both stationary and highly volatile conditions. The proposed approach can achieve higher cumulative rewards, maintain operational feasibility under compound disturbances and exhibit strong adaptability to nonstationary and biased forecasting regimes.

Zitieren

APA

Wang, X., Wang, Z., & La, Y. (2026). Uncertainty‐Quantified Probabilistic Forecasting and Reinforcement Learning for Short‐Term Hydropower Scheduling. IET Cyber-Physical Systems: Theory & Applications, 11(1). https://doi.org/10.1049/cps2.70042

Vancouver

Wang X, Wang Z, La Y. Uncertainty‐Quantified Probabilistic Forecasting and Reinforcement Learning for Short‐Term Hydropower Scheduling. IET Cyber-Physical Systems: Theory & Applications. 2026;11(1). doi:10.1049/cps2.70042

BibTeX
@article{Wang2026,
  author = {Wang, Xin and Wang, Zengchao and La, Yuan},
  title = {Uncertainty‐Quantified Probabilistic Forecasting and Reinforcement Learning for Short‐Term Hydropower Scheduling},
  journal = {IET Cyber-Physical Systems: Theory & Applications},
  year = {2026},
  volume = {11},
  number = {1},
  doi = {10.1049/cps2.70042}
}
Kostenlos starten →