EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Research on prediction of surrounding rock deformation and optimization of construction parameters of high ground stress tunnel based on WOA-LSTM

Jianquan Yao, Jiajia Nie, Chaofeng Li

Scientific Reports · 09.11.2024 · 14 (1)

DOI: 10.1038/s41598-024-79059-x ↗

Kurz gefasst

Fachartikel in der Zeitschrift Scientific Reports, online erschienen am 09.11.2024. Verfasst von Jianquan Yao und 2 weiteren Autor:innen. Beteiligte Einrichtung: China Communications First Highway Engineering Bureau 9th Engineering Co., Ltd, GuangZhou, China. Die Arbeit wurde bisher 19-mal zitiert (Crossref) und nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To accurately understand the deformation behavior of surrounding rock in the jiugongshan No.2 high ground stress tunnel and optimize construction parameters for improved efficiency, on-site monitoring was used to gather data on rock deformation and initial support contact pressure. A WOA-LSTM regression prediction model was proposed, and excavation advance depth was optimized using numerical simulation. The WOA-LSTM regression prediction model demonstrated high accuracy in tunnel deformation monitoring. The absolute errors between predicted and actual values of tunnel settlement and convergence at various measurement points average 2.53- 04 mm and 1.96- 04 mm, with relative errors averaging 2.15% and 2.34%. These results meet the requirements for guiding construction. Additionally, based on the results of numerical simulation calculations, when the step length is 12 m during the construction of high-stress tunnels using the benching method, excavation advances of 2 m and 3 m result in settlement and convergence increases of 35.1% and 63.4%, and 25.5% and 55.2%, respectively, compared to an excavation advance of 1 m. However, no sudden jumps in these values were observed, indicating that with a 3 m excavation advance, the integrity of the surrounding rock remains in good condition, effectively guiding safe and rapid construction methods.

Schlagwörter

Stichwörter der Autor:innen

Construction optimizationDeep learningHigh ground stressTunnel monitoringWOA-LSTM

Autor:innen und Institutionen

  • China Communications First Highway Engineering Bureau 9th Engineering Co., Ltd, GuangZhou, China.
  • China Communications First Highway Engineering Bureau 9th Engineering Co., Ltd, GuangZhou, China. 15286384282@163.com.

Zitieren

APA

Yao, J., Nie, J., & Li, C. (2024). Research on prediction of surrounding rock deformation and optimization of construction parameters of high ground stress tunnel based on WOA-LSTM. Scientific Reports, 14(1). https://doi.org/10.1038/s41598-024-79059-x

Vancouver

Yao J, Nie J, Li C. Research on prediction of surrounding rock deformation and optimization of construction parameters of high ground stress tunnel based on WOA-LSTM. Scientific Reports. 2024;14(1). doi:10.1038/s41598-024-79059-x

BibTeX
@article{Yao2024,
  author = {Yao, Jianquan and Nie, Jiajia and Li, Chaofeng},
  title = {Research on prediction of surrounding rock deformation and optimization of construction parameters of high ground stress tunnel based on WOA-LSTM},
  journal = {Scientific Reports},
  year = {2024},
  volume = {14},
  number = {1},
  doi = {10.1038/s41598-024-79059-x}
}
Kostenlos starten →