Open Access · CC BY 4.0
Decomposing Great Britain's 2025 grid-connection queue reform: readiness, strategic alignment, and non-assessed deferral
Results in Engineering · 2026-12 · 32 · 113763
DOI: 10.1016/j.rineng.2026.113763 ↗Kurz gefasst
Fachartikel in der Zeitschrift Results in Engineering, 2026-12. Verfasst von Sinan Küfeoğlu. Die Arbeit nennt 40 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Küfeoğlu, S. (2026). Decomposing Great Britain's 2025 grid-connection queue reform: readiness, strategic alignment, and non-assessed deferral. Results in Engineering, 32, 113763. https://doi.org/10.1016/j.rineng.2026.113763
Vancouver
Küfeoğlu S. Decomposing Great Britain's 2025 grid-connection queue reform: readiness, strategic alignment, and non-assessed deferral. Results in Engineering. 2026;32:113763. doi:10.1016/j.rineng.2026.113763
BibTeX
@article{Kfeolu2026,
author = {Küfeoğlu, Sinan},
title = {Decomposing Great Britain's 2025 grid-connection queue reform: readiness, strategic alignment, and non-assessed deferral},
journal = {Results in Engineering},
year = {2026},
volume = {32},
pages = {113763},
doi = {10.1016/j.rineng.2026.113763}
}
EUVIMED