Correlation analysis of temporary reconstruction cost and output power reduction in medium- and high-voltage electric motors
Results in Engineering · 2026-03 · 29 · 109245
DOI: 10.1016/j.rineng.2026.109245 ↗Kurz gefasst
Fachartikel in der Zeitschrift Results in Engineering, 2026-03. Verfasst von Mohammad Ali Taheripour und 2 weiteren Autor:innen. Die Arbeit nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Taheripour, M. A., Darabi, A., & Shivaie, M. (2026). Correlation analysis of temporary reconstruction cost and output power reduction in medium- and high-voltage electric motors. Results in Engineering, 29, 109245. https://doi.org/10.1016/j.rineng.2026.109245
Vancouver
Taheripour MA, Darabi A, Shivaie M. Correlation analysis of temporary reconstruction cost and output power reduction in medium- and high-voltage electric motors. Results in Engineering. 2026;29:109245. doi:10.1016/j.rineng.2026.109245
BibTeX
@article{Taheripour2026,
author = {Taheripour, Mohammad Ali and Darabi, Ahmad and Shivaie, Mojtaba},
title = {Correlation analysis of temporary reconstruction cost and output power reduction in medium- and high-voltage electric motors},
journal = {Results in Engineering},
year = {2026},
volume = {29},
pages = {109245},
doi = {10.1016/j.rineng.2026.109245}
}
EUVIMED