Crossref
Delay-informed decision authority for lunar operations: A unified lunar quality framework
Journal of Space Safety Engineering · 2026-06 · 13 (2) · 285-287
DOI: 10.1016/j.jsse.2026.03.004 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Space Safety Engineering, 2026-06. Verfasst von Ralph Figueroa. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 8 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Figueroa, R. (2026). Delay-informed decision authority for lunar operations: A unified lunar quality framework. Journal of Space Safety Engineering, 13(2), 285-287. https://doi.org/10.1016/j.jsse.2026.03.004
Vancouver
Figueroa R. Delay-informed decision authority for lunar operations: A unified lunar quality framework. Journal of Space Safety Engineering. 2026;13(2):285-287. doi:10.1016/j.jsse.2026.03.004
BibTeX
@article{Figueroa2026,
author = {Figueroa, Ralph},
title = {Delay-informed decision authority for lunar operations: A unified lunar quality framework},
journal = {Journal of Space Safety Engineering},
year = {2026},
volume = {13},
number = {2},
pages = {285--287},
doi = {10.1016/j.jsse.2026.03.004}
}
EUVIMED