Joint decision-making for contract duration and benefit sharing in energy performance contract: A China-based shared-savings building retrofit case
Journal of Cleaner Production · 2026-11 · 582 · 149713
DOI: 10.1016/j.jclepro.2026.149713 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Cleaner Production, 2026-11. Verfasst von Shiyu Wan und 4 weiteren Autor:innen. Die Arbeit nennt 97 Literaturangaben. Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Wan, S., Liu, Y., Ding, G., Runeson, G., & Chen, L. (2026). Joint decision-making for contract duration and benefit sharing in energy performance contract: A China-based shared-savings building retrofit case. Journal of Cleaner Production, 582, 149713. https://doi.org/10.1016/j.jclepro.2026.149713
Vancouver
Wan S, Liu Y, Ding G, Runeson G, Chen L. Joint decision-making for contract duration and benefit sharing in energy performance contract: A China-based shared-savings building retrofit case. Journal of Cleaner Production. 2026;582:149713. doi:10.1016/j.jclepro.2026.149713
BibTeX
@article{Wan2026,
author = {Wan, Shiyu and Liu, Yisheng and Ding, Grace and Runeson, Goran and Chen, Lyujun},
title = {Joint decision-making for contract duration and benefit sharing in energy performance contract: A China-based shared-savings building retrofit case},
journal = {Journal of Cleaner Production},
year = {2026},
volume = {582},
pages = {149713},
doi = {10.1016/j.jclepro.2026.149713}
}
EUVIMED