EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Towards implementation of circular building components: A longitudinal study on the stakeholder choices in the development of 8 circular building components

A. van Stijn, B. Wouterszoon Jansen, V. Gruis, G.A. van Bortel

Journal of Cleaner Production · 2023-09 · 420 · 138287

DOI: 10.1016/j.jclepro.2023.138287 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Cleaner Production, 2023-09. Verfasst von A. van Stijn und 3 weiteren Autor:innen. Die Arbeit wurde bisher 16-mal zitiert (Crossref) und nennt 31 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Amsterdam Institute for Advanced Metropolitan Solutions, EIT Climate-KIC, Technische Universiteit Delft.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Implementing circular building components can contribute to the transition to a circular economy. There are many possible circular design options for building components. Knowledge on which options are feasible to implement remains limited. Existing feasibility studies do not compare multiple circular design options, building components and/or are based on interviews rather than observation. They list barriers but do not identify their relative importance throughout a development process. In this article we present a longitudinal study on stakeholder choices in 5 development processes of 8 circular building components. The researchers co-created with stakeholders from initiative up to market implementation. Through process reflection and analysis, we identified choices which influenced the perceived feasibility of circular design options within different building components throughout their development. We found that circular design options perceived as feasible vary between different building components. Specific applications and context influence their feasibility. Moreover, perceived feasibility changes throughout the development process.

Förderung

  • Amsterdam Institute for Advanced Metropolitan Solutions
  • EIT Climate-KIC
  • Technische Universiteit Delft
  • Chalmers Tekniska Högskola

Zitieren

APA

Stijn, A. V., Jansen, B. W., Gruis, V., & Bortel, G. V. (2023). Towards implementation of circular building components: A longitudinal study on the stakeholder choices in the development of 8 circular building components. Journal of Cleaner Production, 420, 138287. https://doi.org/10.1016/j.jclepro.2023.138287

Vancouver

Stijn AV, Jansen BW, Gruis V, Bortel GV. Towards implementation of circular building components: A longitudinal study on the stakeholder choices in the development of 8 circular building components. Journal of Cleaner Production. 2023;420:138287. doi:10.1016/j.jclepro.2023.138287

BibTeX
@article{Stijn2023,
  author = {Stijn, A. van and Jansen, B. Wouterszoon and Gruis, V. and Bortel, G.A. van},
  title = {Towards implementation of circular building components: A longitudinal study on the stakeholder choices in the development of 8 circular building components},
  journal = {Journal of Cleaner Production},
  year = {2023},
  volume = {420},
  pages = {138287},
  doi = {10.1016/j.jclepro.2023.138287}
}
Kostenlos starten →