EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Contract-aware economic scheduling and service settlement for post-disaster restoration of distribution-level virtual power plants

Mingqian Xu, Minghao Li, Gengfeng Li, Yiheng Bian, Yuxiong Huang, Hongsen Wang

International Journal of Electrical Power & Energy Systems · 2026-10 · 183 · 112265

DOI: 10.1016/j.ijepes.2026.112265 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Electrical Power & Energy Systems, 2026-10. Verfasst von Mingqian Xu und 5 weiteren Autor:innen. Die Arbeit nennt 45 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0). Gefördert von: Ministry of Science and Technology of the People's Republic of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Förderung

  • Ministry of Science and Technology of the People's Republic of China

Zitieren

APA

Xu, M., Li, M., Li, G., Bian, Y., Huang, Y., & Wang, H. (2026). Contract-aware economic scheduling and service settlement for post-disaster restoration of distribution-level virtual power plants. International Journal of Electrical Power & Energy Systems, 183, 112265. https://doi.org/10.1016/j.ijepes.2026.112265

Vancouver

Xu M, Li M, Li G, Bian Y, Huang Y, Wang H. Contract-aware economic scheduling and service settlement for post-disaster restoration of distribution-level virtual power plants. International Journal of Electrical Power & Energy Systems. 2026;183:112265. doi:10.1016/j.ijepes.2026.112265

BibTeX
@article{Xu2026,
  author = {Xu, Mingqian and Li, Minghao and Li, Gengfeng and Bian, Yiheng and Huang, Yuxiong and Wang, Hongsen},
  title = {Contract-aware economic scheduling and service settlement for post-disaster restoration of distribution-level virtual power plants},
  journal = {International Journal of Electrical Power & Energy Systems},
  year = {2026},
  volume = {183},
  pages = {112265},
  doi = {10.1016/j.ijepes.2026.112265}
}
Kostenlos starten →