EUVIMEDEUVIMED entdecken
Crossref

Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]

Yu Cao, Guodong Wang, Kezhuang Xue, Jingrui Li, Xingquan Ji, Guojie Li

International Journal of Electrical Power & Energy Systems · 2026-04 · 177 · 111807

DOI: 10.1016/j.ijepes.2026.111807 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Electrical Power & Energy Systems, 2026-04. Verfasst von Yu Cao und 5 weiteren Autor:innen. Gefördert von: State Grid Jiangsu Electric Power.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Förderung

  • State Grid Jiangsu Electric Power

Zitieren

APA

Cao, Y., Wang, G., Xue, K., Li, J., Ji, X., & Li, G. (2026). Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]. International Journal of Electrical Power & Energy Systems, 177, 111807. https://doi.org/10.1016/j.ijepes.2026.111807

Vancouver

Cao Y, Wang G, Xue K, Li J, Ji X, Li G. Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]. International Journal of Electrical Power & Energy Systems. 2026;177:111807. doi:10.1016/j.ijepes.2026.111807

BibTeX
@article{Cao2026,
  author = {Cao, Yu and Wang, Guodong and Xue, Kezhuang and Li, Jingrui and Ji, Xingquan and Li, Guojie},
  title = {Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]},
  journal = {International Journal of Electrical Power & Energy Systems},
  year = {2026},
  volume = {177},
  pages = {111807},
  doi = {10.1016/j.ijepes.2026.111807}
}
Kostenlos starten →