Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]
International Journal of Electrical Power & Energy Systems · 2026-04 · 177 · 111807
DOI: 10.1016/j.ijepes.2026.111807 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Electrical Power & Energy Systems, 2026-04. Verfasst von Yu Cao und 5 weiteren Autor:innen. Gefördert von: State Grid Jiangsu Electric Power.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Förderung
- State Grid Jiangsu Electric Power
Zitieren
APA
Cao, Y., Wang, G., Xue, K., Li, J., Ji, X., & Li, G. (2026). Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]. International Journal of Electrical Power & Energy Systems, 177, 111807. https://doi.org/10.1016/j.ijepes.2026.111807
Vancouver
Cao Y, Wang G, Xue K, Li J, Ji X, Li G. Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]. International Journal of Electrical Power & Energy Systems. 2026;177:111807. doi:10.1016/j.ijepes.2026.111807
BibTeX
@article{Cao2026,
author = {Cao, Yu and Wang, Guodong and Xue, Kezhuang and Li, Jingrui and Ji, Xingquan and Li, Guojie},
title = {Corrigendum to “Real-time optimal decision-making in multi-park systems based on distributed approximate dynamic programming” [Int. J. Electr. Power Energy Syst. 176 (2026) 111748]},
journal = {International Journal of Electrical Power & Energy Systems},
year = {2026},
volume = {177},
pages = {111807},
doi = {10.1016/j.ijepes.2026.111807}
}
EUVIMED