Cracking risk assessment of high arch dam under abnormal abutment deformation during long-term operation
Engineering Structures · 2026-11 · 367 · 123575
DOI: 10.1016/j.engstruct.2026.123575 ↗Kurz gefasst
Fachartikel in der Zeitschrift Engineering Structures, 2026-11. Verfasst von Yi Li und 7 weiteren Autor:innen. Die Arbeit nennt 48 Literaturangaben. Gefördert von: Fundamental Research Funds for the Central Universities, National Natural Science Foundation of China, Foundation for Innovative Research Groups of the National Natural Science Foundation of China.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Förderung
- Fundamental Research Funds for the Central Universities
- National Natural Science Foundation of China
- Foundation for Innovative Research Groups of the National Natural Science Foundation of China
Zitieren
APA
Li, Y., Teng, Y., Wu, X., Zhao, E., Shao, C., Chen, M., Yin, S., & Fang, Y. (2026). Cracking risk assessment of high arch dam under abnormal abutment deformation during long-term operation. Engineering Structures, 367, 123575. https://doi.org/10.1016/j.engstruct.2026.123575
Vancouver
Li Y, Teng Y, Wu X, Zhao E, Shao C, Chen M, et al. Cracking risk assessment of high arch dam under abnormal abutment deformation during long-term operation. Engineering Structures. 2026;367:123575. doi:10.1016/j.engstruct.2026.123575
BibTeX
@article{Li2026,
author = {Li, Yi and Teng, Yunan and Wu, Xianghua and Zhao, Erfeng and Shao, Chenfei and Chen, Ming and Yin, Sidian and Fang, Yixiang},
title = {Cracking risk assessment of high arch dam under abnormal abutment deformation during long-term operation},
journal = {Engineering Structures},
year = {2026},
volume = {367},
pages = {123575},
doi = {10.1016/j.engstruct.2026.123575}
}
EUVIMED