Corrigendum to “Lightweight real-time assessment of bridge substructures based on joint load-parameter-response estimation and output-only measurements” [Eng Struct 348 (2026) 121764]
Engineering Structures · 2026-07 · 359 · 122854
DOI: 10.1016/j.engstruct.2026.122854 ↗Kurz gefasst
Fachartikel in der Zeitschrift Engineering Structures, 2026-07. Verfasst von Chuang Wang und 4 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Wang, C., Zhan, J., Sun, Q., Xu, X., & Xu, H. (2026). Corrigendum to “Lightweight real-time assessment of bridge substructures based on joint load-parameter-response estimation and output-only measurements” [Eng Struct 348 (2026) 121764]. Engineering Structures, 359, 122854. https://doi.org/10.1016/j.engstruct.2026.122854
Vancouver
Wang C, Zhan J, Sun Q, Xu X, Xu H. Corrigendum to “Lightweight real-time assessment of bridge substructures based on joint load-parameter-response estimation and output-only measurements” [Eng Struct 348 (2026) 121764]. Engineering Structures. 2026;359:122854. doi:10.1016/j.engstruct.2026.122854
BibTeX
@article{Wang2026,
author = {Wang, Chuang and Zhan, Jiawang and Sun, Quansheng and Xu, Xinxiang and Xu, Huitong},
title = {Corrigendum to “Lightweight real-time assessment of bridge substructures based on joint load-parameter-response estimation and output-only measurements” [Eng Struct 348 (2026) 121764]},
journal = {Engineering Structures},
year = {2026},
volume = {359},
pages = {122854},
doi = {10.1016/j.engstruct.2026.122854}
}
EUVIMED