Human-in-the-loop framework for automated IFC model validation and closed-loop quality management in BIM
Automation in Construction · 2026-12 · 192 · 107247
DOI: 10.1016/j.autcon.2026.107247 ↗Kurz gefasst
Fachartikel in der Zeitschrift Automation in Construction, 2026-12. Verfasst von Mojtaba Valinejadshoubi und 3 weiteren Autor:innen. Die Arbeit nennt 51 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Valinejadshoubi, M., Mannarella, O., Valdivieso, F., & Corneau-Gauvin, C. (2026). Human-in-the-loop framework for automated IFC model validation and closed-loop quality management in BIM. Automation in Construction, 192, 107247. https://doi.org/10.1016/j.autcon.2026.107247
Vancouver
Valinejadshoubi M, Mannarella O, Valdivieso F, Corneau-Gauvin C. Human-in-the-loop framework for automated IFC model validation and closed-loop quality management in BIM. Automation in Construction. 2026;192:107247. doi:10.1016/j.autcon.2026.107247
BibTeX
@article{Valinejadshoubi2026,
author = {Valinejadshoubi, Mojtaba and Mannarella, Oscar and Valdivieso, Fernando and Corneau-Gauvin, Charles},
title = {Human-in-the-loop framework for automated IFC model validation and closed-loop quality management in BIM},
journal = {Automation in Construction},
year = {2026},
volume = {192},
pages = {107247},
doi = {10.1016/j.autcon.2026.107247}
}
EUVIMED