Prefabricated component production scheduling in a heterogeneous dual-shop system via logic-based Benders decomposition
Automation in Construction · 2026-08 · 188 · 107033
DOI: 10.1016/j.autcon.2026.107033 ↗Kurz gefasst
Fachartikel in der Zeitschrift Automation in Construction, 2026-08. Verfasst von Fuli Xiong und 3 weiteren Autor:innen. Die Arbeit nennt 72 Literaturangaben. Gefördert von: Xi'an University of Architecture and Technology Key Laboratory of Green Building, Natural Science Basic Research Program of Shaanxi Province, National Natural Science Foundation of China.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Förderung
- Xi'an University of Architecture and Technology Key Laboratory of Green Building
- Natural Science Basic Research Program of Shaanxi Province
- National Natural Science Foundation of China
Zitieren
APA
Xiong, F., Ping, A., Wu, M., & Hou, S. (2026). Prefabricated component production scheduling in a heterogeneous dual-shop system via logic-based Benders decomposition. Automation in Construction, 188, 107033. https://doi.org/10.1016/j.autcon.2026.107033
Vancouver
Xiong F, Ping A, Wu M, Hou S. Prefabricated component production scheduling in a heterogeneous dual-shop system via logic-based Benders decomposition. Automation in Construction. 2026;188:107033. doi:10.1016/j.autcon.2026.107033
BibTeX
@article{Xiong2026,
author = {Xiong, Fuli and Ping, An and Wu, Muming and Hou, Shuyu},
title = {Prefabricated component production scheduling in a heterogeneous dual-shop system via logic-based Benders decomposition},
journal = {Automation in Construction},
year = {2026},
volume = {188},
pages = {107033},
doi = {10.1016/j.autcon.2026.107033}
}
EUVIMED