Corrigendum to “Implementation optimal control model of smart grid engineering cluster construction based on Markov decision process” [Alex. Eng. J. 125 (2025) 399–408]
Alexandria Engineering Journal · 2026-05 · 144 · 191
DOI: 10.1016/j.aej.2026.04.015 ↗Kurz gefasst
Fachartikel in der Zeitschrift Alexandria Engineering Journal, 2026-05. Verfasst von Yanxia Gu und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Gu, Y., Wang, H., & Zhang, M. (2026). Corrigendum to “Implementation optimal control model of smart grid engineering cluster construction based on Markov decision process” [Alex. Eng. J. 125 (2025) 399–408]. Alexandria Engineering Journal, 144, 191. https://doi.org/10.1016/j.aej.2026.04.015
Vancouver
Gu Y, Wang H, Zhang M. Corrigendum to “Implementation optimal control model of smart grid engineering cluster construction based on Markov decision process” [Alex. Eng. J. 125 (2025) 399–408]. Alexandria Engineering Journal. 2026;144:191. doi:10.1016/j.aej.2026.04.015
BibTeX
@article{Gu2026,
author = {Gu, Yanxia and Wang, Heng and Zhang, Mingcai},
title = {Corrigendum to “Implementation optimal control model of smart grid engineering cluster construction based on Markov decision process” [Alex. Eng. J. 125 (2025) 399–408]},
journal = {Alexandria Engineering Journal},
year = {2026},
volume = {144},
pages = {191},
doi = {10.1016/j.aej.2026.04.015}
}
EUVIMED