EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Exploring the potential, challenges and benefits of successful BIM implementation from a developing country’s perspective

Abdullah Al Shanto, Kazi Abu Manjur, Asif Faisal Ananta, Sishir Das, Miskat Rahman

Discover Civil Engineering · 09.07.2026 · 3 (1)

DOI: 10.1007/s44290-026-00528-5 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Discover Civil Engineering, online erschienen am 09.07.2026. Verfasst von Abdullah Al Shanto und 4 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 145 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Building Information Modeling (BIM) is a transformative paradigm in the global Architecture, Engineering, Construction, and Operations (AECO) sector, yet its adoption in developing nations like Bangladesh remains nascent. Therefore, this research provides a comprehensive analysis of the critical factors, benefits, and challenges of shaping BIM implementation from the perspective of a developing country, Bangladesh. This study employs a mixed-methods approach, integrating findings from a survey of 268 valid AECO stakeholders (students, educators, and professionals) with a 4D simulation case study of a multi-story building. The survey reveals a critical gap between awareness and competency; while 77.2% of respondents are familiar with BIM, only 34.4% have received professional training. An exploratory factor analysis confirmed four predefined sections, classified and identified 32 crucial factors. Then, a Relative Importance Index (RII) identified university-industry collaborations for BIM programs and government support and enforcement as the most critical drivers for adoption. Other vital factors indicated acknowledgment of BIM’s efficiency, inadequate industry knowledge, a lack of promotion, seminars, and the establishment of training courses. An independent samples t-test exposed a substantial perceptual gap between the optimistic expectations of students and the pragmatic views of professionals. The 4D simulation case study validated BIM’s practical benefits, demonstrating a 13.5% reduction in project completion time and revealing a potential for time and cost savings through early detection of 355 design clashes. Ultimately, the findings contribute to a robust, empirically supported roadmap for policymakers and industry leaders by offering specific, actionable recommendations to accelerate BIM adoption and enhance construction sector productivity.

Zitieren

APA

Shanto, A. A., Manjur, K. A., Ananta, A. F., Das, S., & Rahman, M. (2026). Exploring the potential, challenges and benefits of successful BIM implementation from a developing country’s perspective. Discover Civil Engineering, 3(1). https://doi.org/10.1007/s44290-026-00528-5

Vancouver

Shanto AA, Manjur KA, Ananta AF, Das S, Rahman M. Exploring the potential, challenges and benefits of successful BIM implementation from a developing country’s perspective. Discover Civil Engineering. 2026;3(1). doi:10.1007/s44290-026-00528-5

BibTeX
@article{Shanto2026,
  author = {Shanto, Abdullah Al and Manjur, Kazi Abu and Ananta, Asif Faisal and Das, Sishir and Rahman, Miskat},
  title = {Exploring the potential, challenges and benefits of successful BIM implementation from a developing country’s perspective},
  journal = {Discover Civil Engineering},
  year = {2026},
  volume = {3},
  number = {1},
  doi = {10.1007/s44290-026-00528-5}
}
Kostenlos starten →