Dynamic Allocation of Critical Chain Buffers for Multi-objective Optimization and Project Schedule Risk Management

Xueqing Zhang, Hongzhe Qin, Zhiqiang Fu, Shiwei Ding, Jikun Zhang, Dongke Li, Xiangtian Nie, Tianyu Fan

International Journal of Computational Intelligence Systems · 18.06.2026 · 19 (1)

DOI: 10.1007/s44196-026-01425-6 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Computational Intelligence Systems, online erschienen am 18.06.2026. Verfasst von Xueqing Zhang und 7 weiteren Autor:innen. Die Arbeit nennt 46 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0). Gefördert von: State Grid Xinyuan Group Co., Ltd Science and Technology Project, the Training Programme for Young Backbone Teachers of Higher Education Institutions in Henan Province, the High-level Talent Research Start-up Project of North China University of Water Resources and Electric Power.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Considering duration, cost, and quality constraints, this study develops a multi-objective optimization model for project scheduling. The framework employs trapezoidal fuzzy numbers to characterize activity durations and a bell-shaped function to define the duration-quality trade-off. An optimal schedule is derived using a genetic algorithm. To mitigate uncertainties in construction progress, four duration risk categories—resource, operational, human, and environmental—are quantified through risk coefficients and weighting factors to establish a robust buffer sizing mechanism. Upon 50% completion of the planned workload, a grey GM(1,1) model is implemented to forecast activity finish times based on real-time progress monitoring. Furthermore, a dynamic buffer allocation model is established by integrating initial buffers, early completion gains, and cumulative buffer consumption. Application to a pumped storage power station project demonstrates that the proposed method reduces the total duration by 18 days, confirming its efficiency and practical utility in complex engineering environments.

Förderung

  • State Grid Xinyuan Group Co., Ltd Science and Technology Project
  • the Training Programme for Young Backbone Teachers of Higher Education Institutions in Henan Province
  • the High-level Talent Research Start-up Project of North China University of Water Resources and Electric Power
  • the Natural Science Youth Fund Project of Henan Province

Zitieren

APA

Zhang, X., Qin, H., Fu, Z., Ding, S., Zhang, J., Li, D., Nie, X., & Fan, T. (2026). Dynamic Allocation of Critical Chain Buffers for Multi-objective Optimization and Project Schedule Risk Management. International Journal of Computational Intelligence Systems, 19(1). https://doi.org/10.1007/s44196-026-01425-6

Vancouver

Zhang X, Qin H, Fu Z, Ding S, Zhang J, Li D, et al. Dynamic Allocation of Critical Chain Buffers for Multi-objective Optimization and Project Schedule Risk Management. International Journal of Computational Intelligence Systems. 2026;19(1). doi:10.1007/s44196-026-01425-6

BibTeX
@article{Zhang2026,
  author = {Zhang, Xueqing and Qin, Hongzhe and Fu, Zhiqiang and Ding, Shiwei and Zhang, Jikun and Li, Dongke and Nie, Xiangtian and Fan, Tianyu},
  title = {Dynamic Allocation of Critical Chain Buffers for Multi-objective Optimization and Project Schedule Risk Management},
  journal = {International Journal of Computational Intelligence Systems},
  year = {2026},
  volume = {19},
  number = {1},
  doi = {10.1007/s44196-026-01425-6}
}
Kostenlos starten →