Exploring cognitive process of construction engineering tacit knowledge transfer based on interpersonal brain synchronization
ENGINEERING Management · 2026-06 · 13 (2) · 541-558
DOI: 10.1007/s42524-026-5105-7 ↗Kurz gefasst
Fachartikel in der Zeitschrift ENGINEERING Management, online erschienen am 07.03.2026. Verfasst von Xiaotong Guo und 4 weiteren Autor:innen. Die Arbeit nennt 49 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Guo, X., Zhang, S., Zhao, H., Wang, M., & Fu, H. (2026). Exploring cognitive process of construction engineering tacit knowledge transfer based on interpersonal brain synchronization. ENGINEERING Management, 13(2), 541-558. https://doi.org/10.1007/s42524-026-5105-7
Vancouver
Guo X, Zhang S, Zhao H, Wang M, Fu H. Exploring cognitive process of construction engineering tacit knowledge transfer based on interpersonal brain synchronization. ENGINEERING Management. 2026;13(2):541-558. doi:10.1007/s42524-026-5105-7
BibTeX
@article{Guo2026,
author = {Guo, Xiaotong and Zhang, Shuailong and Zhao, Heyang and Wang, Mengmeng and Fu, Hanliang},
title = {Exploring cognitive process of construction engineering tacit knowledge transfer based on interpersonal brain synchronization},
journal = {ENGINEERING Management},
year = {2026},
volume = {13},
number = {2},
pages = {541--558},
doi = {10.1007/s42524-026-5105-7}
}
EUVIMED